Similar Projects
Archery Park Water Line
Post-Bid
Ogden, UT 84401

3900 South Waterline Improvement Project
Post-Bid
Less than $174,155 est. value
Riverdale, UT 84405

DFCM Construction-DOC AP and P NUCCC Repipe Potable Water Pipes and Sewer Lines
Results
$829,370 est. value
Ogden, UT 84401

Apple Grove Water Main Upgrade
Results
Ogden, UT 84404

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Regency Drive Waterline Replacement
Results
Less than $198,270 est. value
Ogden, UT 84403

River Bottom Improvement Project Prequalification
Post-Bid

Pierce Water Connections
Results
$2,500,000 est. value
Ogden, UT 84401

2021 Waterline Replacement and Storm Drain Project
Post-Bid
North Ogden, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Zone 1E - Irrigation Pond
Post-Bid
Bluffdale, UT

Washington Boulevard 700 North Waterline Project
Results
Less than $496,094 est. value
Harrisville, UT 84404

200 South Waterline Project
Post-Bid
Marriott-Slaterville, UT

700 South and 1200 West CDBG Project
Results
Less than $446,804 est. value
Marriott-Slaterville, UT 84404

400 East Waterline Replacement
Results
$478,960 to $598,773 est. value
North Ogden, UT 84414

Last Updated 12/21/2020 12:11 PM
Project Title

2020 Water Projects

Physical Address View project details and contacts
City, State (County) Ogden, UT 84404   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of three culinary water projects located in West Warren, Utah. These projects will be bid and awarded separately. Projects are summarized below: Metering Vault - Construction of a new meter vault located at 7740 West 900 South. The work includes installation of the concrete meter vault, piping, fittings, meter, PRV, connections to existing waterlines, SCADA, and associated work as indicated in the contract documents. 700 North Waterline - Construction of approximately 3,075 lineal feet of 8-inch diameter culinary water pipe on 700 North Street from 5900 West to 6300 West. The work includes installation of pipe, valves, and fittings; testing and disinfection; asphalt patching; and completion of associated work as indicated in the contract documents. 7500 West Waterline - Construction of approximately 4,800 lineal feet of 8-inch diameter culinary water pipe on 7500 West Street from 1400 South to 2200 South. The work includes installation of pipe, valves, and fittings; testing and disinfection; asphalt patching; and completion of associated work as indicated in the contract documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents