Similar Projects
Dam Safety Modification Additional Relief Wells and Collector System Upgrades, Mohawk Dam, Warsaw, Ohio
Design
Warsaw, OH 43844

Well Number 6 and Raw Water Main
Infrastructure
Bidding
Circleville, OH

Bear Exhibit Redevelopment Project - Bid Package #2
Term Contract
Bidding
Toledo, OH 43609

Pump Motor Replacement
Post-Bid
New Boston, OH 45662

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

DM-2 Pump Replacement
Results
Less than $365,000 est. value
Dayton, OH

Trash Pump
Results

Repair of Queensgate Fuel Piping and Pump Replacement
Infrastructure
Bidding
Cincinnati, OH 45214

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Water Supply Well No. 6
Results
Less than $76,812 est. value
Blacklick, OH

Southerly Boiler Feedwater Pumps Replacement
Alteration
Bidding
$305,000 est. value
Cleveland, OH

Drilling (4) Monitoring Wells, Ohio, USA
Post-Bid
$25,000 to $100,000 est. value
Columbus, OH

Beaver Creek State Park Horseman's Camp Well and Electric Improvements
Results
Less than $165,700 est. value
East Liverpool, OH

Private Water Service Plan
Infrastructure
Bidding
Groveport, OH 43125

Richards Well Field Expansion Project
Post-Bid
Circleville, OH 43113

Reported 08/27/2021 12:00 AM
Project Title

Chilled Water Plant 3 Distribution Pump 2021

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $280,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope involves adding a chilled water distribution pump system into the Ohio University Chilled Water Plant 3, located on North McKinley Avenue on the east side of the Athens Campus. This plant feeds into the campus chilled water distribution system, and was completed in 2020. The plant was designed with the locations and capacity to fit-out for future equipment, including this distribution pump system

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents