Similar Projects
Mechanical, Plumbing, and Electrical Systems at Pleasant Creek School
Alteration
Bidding
$200,000 est. value
Mount Pleasant, UT 84647

Elkay Bottle Filler Stations
Alteration
Post-Bid
Ephraim, UT 84627

Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

Domestic Brass Fittings - Plumbing Supplies
Term Contract
Results
Farmington, UT 84025

Shower/Kitchen/Bathroom Remodel Plumbing
Results
UT

HVAC and Plumbing
Term Contract
Post-Bid

U Hospital Mediserve Renovo Dock Remodel - Plumbing
Results
$54,900 est. value
Salt Lake City, UT 84113

New Construction of Residential Building - Plumbing
Alteration
Post-Bid
Blanding, UT 84511

SLCC PSET Tankless Waters
Alteration
Results
$150,000 est. value
Sandy, UT 84070

Sand Filter Replacement with Defender Units
Alteration
Post-Bid
Saint George, UT 84770

Emergency Eyewash Upgrades Phase 2
Renovation, Term Contract
Results
$650,000 est. value
Salt Lake City, UT 84112

Plumbing Fixtures
Term Contract
Post-Bid
Salt Lake City, UT

DFCM Construction - Pre Qualified Site/Civil Controls - USH Backflow Prevention Upgrade
Term Contract
Results
$104,000 est. value
Provo, UT 84606

HVAC and Plumbing Services
Alteration
Post-Bid
Salt Lake City, UT

Salt Lake Airport On-Call Plumbing Services
Alteration
Results
$25,000 to $150,000 est. value
Salt Lake City, UT

Last Updated 05/25/2022 08:25 AM
Project Title

Division of Juvenile Justice Services Millcreek Youth Detention Center Shower/Plumbing Fixture Upgrade

Physical Address View project details and contacts
City, State (County) Ogden, UT 84404   (Weber County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $329,291 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing the above-ceiling water piping and remodeling the existing shower/bath rooms in the housing units. There are two housing units at the youth center and each housing unit is subdivided into two areas. One half of each building will be occupied during the construction and the occupied half will need to be operational during the construction. The existing above ceiling supply water lines will be removed and replaced in both buildings along with recirculation pumps. New water lines will also be provided to the bath/shower rooms that are being remodeled. The shower rooms located in three of the four subdivided units will be remodeled. The remodel will consist of removal of the existing ceramic floor and wall tiles, mortar beds, removal of existing toilet room accessories, lavatories, shower fixtures, water closets, floor drains, ceiling systems and lighting. New tile mortar beds, waterproofing, ceramic floor, wall and ceiling tiles will be installed. New toilet and shower room accessories, painting, lavatories, shower fixtures, water closets, floor drains, ceiling systems and lighting will also be installed in the shower/bath rooms. The existing fire sprinkler heads in the shower/bath rooms will be adjusted and replaced with new sprinkler heads.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents