Similar Projects
One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Valley View Avenue & Rosecrans Avenue Intersection Improvements
Infrastructure
Post-Bid
$617,000 to $620,000 est. value
Santa Fe Springs, CA 90670

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Encampment Clean-Up Contractor
Alteration
Results
Santa Clarita, CA

HMA (Type A), Roadway Excavation, and Class 2 Aggregate Base
Infrastructure
Results
$5,700,000 est. value
Los Angeles, CA

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

Harper on Sunset Mixed Use Development
Demolition, New Construction, Infrastructure
Design
$97,000,000 CJ est. value
West Hollywood, CA 90046

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

Place Culvert, Replace Drainage System, Reconst Roadway and Embankment
Infrastructure
Results
$28,000,000 est. value
CA

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

The Ocean Avenue Project
LEED Certification, New Construction, Infrastructure - 122,400 SF
Pending Verification
$20,000,000 CJ est. value
Santa Monica, CA 90401

Last Updated 03/30/2023 11:34 AM
Project Title

RFP D/B - Manhattan Beach Boulevard Eastbound Left-Turn Improvement at Aviation Boulevard

Physical Address View project details and contacts
City, State (County) Manhattan Beach, CA 90266   (Los Angeles County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 08th, 2022, project has not been awarded. The proposals are under review, the intersection design would not start until October 2022. The construction of the project will not start until early 2024. Shortlist confirmed Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 06/16/2022 12:00 PM (PDT). Pre-Bid Meeting No The City of Manhattan Beach plans to design and construct intersection improvement for the Manhattan Beach Boulevard eastbound left-turn lane at Aviation Boulevard. The project will include modifications to the west leg, and might include slight modifications to the other three legs of the intersection. Two options are considered: 1. Construct a second eastbound left-turn lane by reducing the widths of the raised center median, eastbound and westbound travel lanes to accommodate the second left-turn lane. The scope of the project includes replacement of the existing traffic signal poles with mast arms for eastbound-westbound left-turn arrows, which would require new traffic signal electrical wiring/conduit and might need replacement of the existing traffic signal cabinet with Advanced Transportation Controllers (ATC) and Video (Detection) Management Systems (VMS) capable of communicating via advanced fiber network along with Battery Backup Systems (BBS). Any related miscellaneous curb & gutter, curb ramp ADA features, driveway approach, restriping, median reconstruction, markings, signage, and landscape/irrigation restoration will also be a part of the scope of work of this project. The boundary area affected by the removal of old striping will require a Type II Slurry Seal and new striping, signage, and markings where applicable. A new loop detection system will be installed for the left-turn lanes, along with the replacement of wiring. This option will prohibit the currently allowed eastbound U-Turn activities. 2. Elongate the existing eastbound left-turn lane pocket from approximately 200' to 330'. The scope of the project includes the reconstruction of the median island located on Manhattan Beach Boulevard west of Aviation Boulevard. Any related miscellaneous curb & gutter, restriping, markings, signage, and landscape/irrigation restoration will also be a part of the scope of work of this project. The boundary area affected by the removal of old striping will require a Type II Slurry Seal and new striping, signage, and markings where applicable. A new loop detection system will be installed for the left-turn lane, along with the replacement of wiring. Based on the intersection infrastructure conditions, the improvement might include new traffic signal poles, traffic signal electrical wiring/conduit and might need replacement of the existing traffic signal cabinet with Advanced Transportation Controllers (ATC) and Video (Detection) Management Systems (VMS) capable of communicating via advanced fiber network along with Battery Backup Systems (BBS). This option will keep the currently allowed eastbound U-Turn activities. No right-of-way acquisition is expected for both options. Also, the intersection signal system will be modified to optimize the signal phase, cycle length, and green time assignment, which will further avoid potential eastbound-westbound left-turn interlocking problems. The proposed improvement at this intersection will relieve the congestion during peak commuting periods and allow smooth traffic flow along Manhattan Beach Boulevard, which will ultimately relieve traffic congestion along Manhattan Beach Boulevard and Aviation Boulevard traffic corridors. The Consultant to provide design services for the Manhattan Beach Boulevard eastbound left-turn lane at Aviation Boulevard Project in terms of preparing site plan, plans, specifications, cost estimate, environmental analysis, right-of-way documentation and bidding and construction phase engineering support. The design consultant shall prepare a complete drawing set of plans, notes, and details to construct the proposed improvements. The construction drawings shall include all necessary and significant civil aspects of design and utilize the City's standard title block. The design consultant shall prepare detailed Specifications for the improvements to be incorporated into the City's standard "boilerplate" Contract Documents. The design consultant shall prepare detailed cost estimates for the improvements. All drawing sheets must be stamped by a civil engineer, licensed by the State of California. Plans and calculations by others must be reviewed and approved by the Engineer of Record for the project. The design consultant shall ensure that the final design contains a typical industry-standard level of detail required to procure and construct the proposed improvements. Design submittals are required to be submitted to the City for review and comment at 35%, 65%, 95% and final Plans. Specifications submittals are required to be submitted to the City for review and comment at 90%, complete and final Specifications. Also, the design consultant shall assist the City with tasks during the bidding and construction phase. The work includes, but is not limited to the following design services: A. Project Management B. Background Research C. Field Check and Data Collection D. Utility & Agency Coordination E. Preliminary Design F. Environmental Analysis G. Signal Operation Study H. Final Design - Plans, Specifications and Estimates I. Right-Of-Way J. Construction Phase The City anticipates the Design Services to begin in November 2022 with final plans, specs, and estimates ready for public bid by end of May 2023.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents