Similar Projects
Reported | 11/14/2019 10:19 AM |
Project Title | Water Utilities Facility Improvements - Phase 2 (Material Storage Bunker Building) |
Physical Address | View project details and contacts |
City, State (County) | Grand Prairie, TX 75050 (Dallas County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | |
Project Status | Construction Commenced November 2019 |
Bids Due | View project details and contacts |
Estimated Value | $1,140,893 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 0.65 Acres of Site Preparation, a 150’ x 37’-6” Material Storage Bunker Building, 480 Vertical Feet of 24” Drilled Shaft/Pier, 192 Vertical Feet of 30” Drilled Shaft/Pier, (2) Six Grate Inlets, (1) 4’ x 4’ Drop Inlet, 83 Linear Feet of 18” RCP Storm Sewer, 540 Cubic Yards of Unclassified Excavation, 820 Cubic Yards of Unclassified Embankment, 1,751 square yards of 8-inch Reinforced Concrete Pavement with 8-inch Flexible Base, 80 Linear Feet of Portable & Precast Concrete Traffic Barrier, 743 Square Feet of Retaining Wall TxDOT Type RW 1 (L) C. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |