Similar Projects
South Side Entertainment District - Phase II
New Construction - 80,000 SF
Conception
$10,000,000 CJ est. value
Blaine, MN 55449

Lawshe Museum Elevator Replacement
Renovation
Results
Hastings, South Saint Paul, MN 55075

Lawshe Museum
Renovation
Post-Bid
$775,000 est. value
South Saint Paul, MN 55075

Juxtaposition Arts Center
New Construction, Renovation - 15,572 SF
Construction
$14,000,000 est. value
Minneapolis, MN 55411

Burwell House And Outbuildings - Exterior Repairs 1
Renovation
Results
Minnetonka, MN 55305

George Stoppel Farmstead Rehabilitation
Renovation
Post-Bid
Rochester, MN 55902

The M - Phase II
Renovation
Post-Bid
$1,000,000 est. value
Saint Paul, MN 55101

Minnesota History Center 1st Floor Restroom Remodel
Build-out
Results
$571,500 CJ est. value
Saint Paul, MN 55102

Last Updated 04/20/2023 12:33 AM
Project Title

Capitol Building Exterior Repairs

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55101   (Ramsey County)
Category(s) Entertainment/Recreation
Sub-Category(s) Museum
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $416,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will done under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Select Sealant Replacement at various locations as indicated in drawings. 2. Tuckpointing at various locations as indicated in drawings. 3. Tile Mortar Repair in the floor of the quadriga, see drawings. 4. Repainting select doors and window sills 5. Concrete repairs 6. Cat-walk support posts penetrations are to be sealed at top of post. 7. Replace Heat Tape at Granite Gutters where indicated in drawings. 8. Skylight Mullion Covers are to be repositioned and secured as described. 9. Windows in the lantern area are to be replaced 10. Ladder to be removed from top of Capitol Building The Section 00 41 73 Prime Contractor Response Form, which includes the attachments listed in the project manual table of contents, is posted within the VirtuBid . The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor, the work for at least 3 contracts which have achieved Substantial Completion since December 2018 for repair of building masonry façade components, sealant installation, window replacement and concrete repairs. Each of these contracts MUST have had a construction value of $350,000 or greater. OR In lieu of Responding companys projects, Responder may provide on the form below up to 3 qualifying projects completed by the Project Manager while employed by others which have achieved Substantial Completion since December 2018 for repair of building masonry façade components, sealant installation, window replacement and concrete repairs, and $350,000 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least 10 years of experience with repair of building masonry façade components, sealant installation, window replacement and concrete repairs similar in scope and value to this project. Each of these contracts must have had a construction value of $350,000 or greater. Est. Completion Date: Sept. 2, 2023 All questions should be submitted no later than 12/2/2022 to Katy McCann, katy.mccann@state.mn.us

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents