Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000 CJ est. value
Huntley, IL 60142

Career, Technical and Manufacturing Center
New Construction - 52,300 SF
Design
Less than $21,850,200 est. value
Crystal Lake, IL 60012

Career, Technical and Manufacturing Center
New Construction - 52,300 SF
Design
Less than $21,850,200 est. value
Crystal Lake, IL 60012

2023 Sidewalk Replacement Program
Infrastructure
Bidding
$300,000 CJ est. value
Woodstock, IL 60098

Harmony Road Culvert Replacements
Infrastructure
Bidding
$300,000 CJ est. value
Marengo, IL 60152

Adaptive Reuse of Property
Infrastructure
Post-Bid
Cary, IL 60013

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

McHenry County College Foodservice Renovation
Renovation
Results
$60,000 to $80,000 est. value
Crystal Lake, IL

Expansion of Center for Agrarian Learning Student Farm - Landscaping Services
Infrastructure
Results
Crystal Lake, IL 60012

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

2022 CDBG Sidewalk Program
Infrastructure
Construction
$237,131 CJ est. value
Harvard, IL 60033

AZE Distribution Center
New Construction, Infrastructure - 175,600 SF
Pending Verification
$19,000,000 CJ est. value
Huntley, IL 60142

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

Huntley-Dundee Sanitary Sewer Replacement - 22-PWSew-004 - Village of Huntley
Infrastructure
Conception
$275,000 CJ est. value
Huntley, IL 60142

Last Updated 01/19/2023 03:08 PM
Project Title

Construct Career, Technical and Manufacturing Center - Phase 1

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60012   (McHenry County)
Category(s) Education, Green Building, Heavy and Highway
Sub-Category(s) College/University, LEED Certified, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $25,458,326 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Single Prime Delivery Method project. PLA is applicable to this project.

Details

52,300 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents