Similar Projects
Asphalt Resurface
Infrastructure
Bidding
IN

Highland Elementary School Parking Lot Renovation Project 2022
Infrastructure
Bidding
Evansville, IN 47710

Water Distribution System Construction, Maintenance and Repair
Post-Bid
Evansville, IN

Roadway Improvements
Post-Bid
Darmstadt, IN

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Michigan and Evans Sewer Replacement
Results
Evansville, IN 47708

Green River Road Trail Project
Infrastructure
Bidding
Evansville, IN 47725

2021 Community Crossings
Post-Bid
Evansville, IN

Old State Utility Sewer Rehabilitation
Results
Evansville, IN 47708

2021 ADA Curb Ramp Installation
Infrastructure
Post-Bid
Evansville, IN

Bartels Drive Water Main Replacement
Results
Less than $383,296 est. value
Evansville, IN 47710

Expand Economy Parking Lot
Infrastructure
Post-Bid
Evansville, IN

EWSU 2021 Water Department Materials
Results
Evansville, IN

New Harmony Road Water Main Improvements
Results
Less than $829,975 est. value
Evansville, IN

Grove Street, South of Allens Lane Water Main Replacement
Results
Less than $876,498 est. value
Evansville, IN 47710

Last Updated 04/04/2022 05:03 PM
Project Title

EWSU - GI Actuator Retrofit

Physical Address View project details and contacts
City, State (County) Evansville, IN   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,841,777
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Retrofitting 35 green infrastructure sites across the city of Evansville to incorporate actuated valves,water eve sensors,and control panels to eliminate the need for manual operations. This project will include installation of New fanged pug vaves with actuators; Control Panels for singe and double actuators; Leve sensors; New overflow manholes and piping; New poes,power drops and meters; Electrical conduits; Connections for the Cherry Street rain gardens; Asphalt ,brick,and or concrete pavement sidewalk repair; Traffic control and signage. Work shall also include a supervision ,equipment, traffic control , granular backfill ,pavement restoration (milling included) , flushing ,disinfecting ,testing and a appurtenances necessary

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents