Similar Projects
Open End, Structure Maintenance, North District, FY22-24
Term Contract
Bidding
Middletown, DE

Open End, Structure Maintenance, North District, FY23-25
Term Contract
Bidding
$4,000,000 est. value
Middletown, DE

Scour Countermeasures, Open End (Fy22-FY24)
Post-Bid
DE

Carsyljan Acres Drainage Improvements Project
Infrastructure
Post-Bid
Lewes, DE 19958

SVFD Roof and Drainage Renovation
Results
Seaford, DE 19973

Thousand Acre Marsh Tide Gates Replacement
Results
DE

Open-end, Drainage Repair I, North District, FY23-25
Term Contract, Infrastructure
Bidding
$400,000 est. value
Middletown, DE

Odor, Corrosion and H2s Control - Transmission System
Infrastructure
Post-Bid
New Castle, DE

North Hills-300-302 Woodland Drive
Results
Newark, DE 19702

Pigeon Point Road Drainage - Port Contractors
Infrastructure
Bidding
$400,000 est. value
New Castle, DE 19720

High Density Polyethylene Pipe
Term Contract, Infrastructure
Post-Bid

Covered Bridge Farms-Trotters Turn
Results
Newark, DE 19711

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Fox Hollow Drainage Improvement Project
Results
Georgetown, DE 19947

Curtis Lane Culvert Replacement
Results
Newark, DE 19711

Last Updated 07/12/2022 07:50 AM
Project Title

Hessler Property Site OU-3 Remediation Culvert Installation

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19801   (New Castle County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work requires that the Contractor provide all labor, materials, equipment, and supervision necessary for installation of reinforced concrete pipe culvert. The work will include placement of reactive core matting, geotextiles, ground improvements, placement of pipe culvert, filling and grading as specified in the drawings. Due to the condition of the site soils processing and loading of excavated soils will be required if the soils cannot be reused onsite. The Hessler OU-3 Site is in Wilmington, Delaware. Note that prevailing wage provisions are applicable to this procurement. Also, requirements set forth in 20 CFR 1910.120 (HAZWOPER) will partially apply to this project. HAZWOPER training and medical monitoring will be required for personnel performing intrusive earthwork activities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents