Similar Projects
Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Slc Airport Economy Parking Lot Bus Route Reconfiguration
Results
Salt Lake City, UT

2021 South Salt Lake City Micro-Surface Seal Project
Results
Salt Lake City, UT 84111

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Liberator Drive Warehouse
New Construction, Infrastructure - 50,250 SF
Design
$10,000,000 CJ est. value
Kearns, UT 84118

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

12200 South Widening Project; 600 E TO 700 E
Results
Draper, UT

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

Murray Mill and Overlay 2021
Infrastructure
Post-Bid
Murray, UT

Bengal Blvd and 2300 East Round-About Intersection Modification
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Cottonwood Residential - Western Gardens
Demolition, New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Salt Lake City, UT 84102

Last Updated 02/03/2023 12:40 PM
Project Title

600 and 700 North Mobility, Safety and Transit Improvements Study

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2020 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The selected consultant's work should summarize existing conditions and deficiencies; collect and synthesize public input; and recommend future improvements and phasing. For many years the 600 & 700 North corridor has functioned solely as a transportation facility. Residents and leaders desire to transform it into a "place" and a "connection". Ultimately, Study recommendations will provide context-appropriate analyses, designs, and implementation and funding strategies for transforming the corridor into a "Great Street" that (1) is memorable, (2) represents and connects the community, (3) fosters life and participation in the public realm, and, (4) provides a comfortable and safe place for all users. The 600 & 700 North corridor will be among the first to be improved with more frequent service as a part of the 2017 Transit Master Plan's Frequent Transit Network (FTN). The City's designated contact person for questions or additional information concerning the services specified in this RFP, or for additional information concerning Request for Proposal procedures and regulations (i.e., submission deadline, forms required, etc.), or Americans with Disabilities (ADA) accommodations, is George Brinkerhoff in the Purchasing and Contracts Management Division: telephone (801) 535-6446; TDD (801) 535-6021; FAX (801) 535-6638; e-mail george.brinkerhoff@slcgov.com . No interpretation of the meaning of any provision in this RFP, nor correction of any apparent ambiguity, inconsistency, error, or any other matter pertaining to this RFP shall be made to the offeror orally. All questions requesting clarification or interpretation of any section or sections of this RFP must be submitted online through the Utah Public Procurement Place (UPPP) website prior to 5:00 pm, Wednesday, July 3, 2019. Website links are shown in Section V above.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents