Similar Projects
Boiler Pre-Purchase
Alteration
Results
Wilmington, DE

Mechanical and Controls Maintenance Services
Term Contract
Results
Dover, DE 19901

Boiler Replacement at Multiple Schools
Alteration
Post-Bid
New Castle, DE 19804

Keene Elementary School Esser Boiler Renovations
Alteration
Post-Bid
Newark, DE 19702

Filtered Water Refill Station - Red Clay Consolidated School District
Term Contract
Post-Bid
Wilmington, DE 19805

Plummer Community Corrections Center-Middle Building Boiler Replacement
Alteration
Results
$118,275 est. value
Wilmington, DE 19802

Boiler Replacement at New Castle Elementary School
Alteration
Results
$719,560 est. value
New Castle, DE 19720

Replacement of Utility Meters Dover AFB
Post-Bid
$100,000 to $250,000 est. value
Dover AFB, DE

Woodbridge Early Childhood Education Center Hot Water Boiler System Replacement
Alteration
Post-Bid
$811,000 est. value
Greenwood, DE 19950

Woodbridge Early Childhood Education Center Hot Water Boiler System Replacement
Alteration
Post-Bid
$811,000 est. value
Greenwood, DE 19950

Boiler Replacement at Ellendale Crisis Center
Alteration
Results
Ellendale, DE 19941

Gallaher Elementary School - Chiller Replacement
Alteration
Post-Bid
Newark, DE 19713

Boiler Inspection and Maintenance Services
Alteration
Results
Wilmington, DE

Last Updated 05/11/2022 06:10 AM
Project Title

New Castle County Detention Center Boiler Replacement

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19805   (New Castle County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Involves the replacement of the existing domestic hot water exchanger (integral to the existing boiler) with a stand-alone heat exchanger and domestic hot water feed pump replacement. Scope also includes the replacing of the heating hot water boiler with high efficiency boilers with boiler pumps and replacement of the heat pump loop heat exchanger and heating hot water feed pumps. Restore existing electrical power and lighting system and equipment to operational condition. Additionally, the scope includes the replacement of a combustion air intake fan and the installation of new boiler flue vent dampers.

Details

Division 03 - Concrete.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents