Similar Projects
Steel Pipe
Infrastructure
Bidding
Richmond, VA 23219

Soil Stabilization Rt 669 Pittsylvania
Infrastructure
Bidding
VA

Kessler Mill Drainage Improvements
Post-Bid
Salem, VA

PPEA Blacks Run Restoration and Nutrient Reduction
Post-Bid
Harrisonburg, VA

Border Road Drainage Improvements Phase 2B
Results
Chesapeake, VA

Chincoteague NWR, VA Remove and Replace Water Control Structures
Results
Chincoteague, VA

IFB 156897 Culvert Pipe Rehab
Infrastructure
Bidding

Spring 2019, Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
Fairfax, VA 22035

On-Call Pipe Culvert Rehabilitation
Results
Less than $500,000 est. value

Roanoke River Greenway - Bridge the Gap Phase II Segment 2
New Construction
Bidding
Roanoke, VA

Reconstruction of One Earthen Shoreline Wave Berm on One Flood Control Dam
Post-Bid
Culpeper, VA

On-Call Pipe Rehabilitation and Repair
Results
Less than $701,000 est. value

Construction of Educational Pond Rehabilitation at Virginia Aquarium
Infrastructure
Bidding
Virginia Beach, VA

Reston Metro Center Walkway
Alteration
Post-Bid
Reston, VA 20191

On-Call Rock Slope Repair
Results
Less than $6,174,000 est. value

Last Updated 10/05/2021 11:18 AM
Project Title

Robin Grove Living Shoreline

Physical Address View project details and contacts
City, State (County) Colonial Beach, VA   (Westmoreland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to prevent shoreline erosion, improve water quality, and improve habitat for fish and wildlife. The bid shall include estimates for: 1):furnishing all labor, equipment and materials, and performing all operations in connection with the hauling and placement of stone; 2) furnishing all labor, plants, equipment, and materials and performing all operations required to complete the installation of filter cloth; 3) furnishing all labor, equipment, and materials, and performing all operations required to obtain, transport, place, and grade the beach fill material; 4) furnishing all labor, plant, equipment, and materials, and performing all operations required to:: (i) furnish, spread, and rake topsoil for seeding; and (ii) complete the restoration off all graded and disturbed areas within the Limit of Contract; 5) furnishing all labor, plant, equipment and materials, and performing all operations required to complete the installation of the wetlands vegetation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents