Similar Projects
Storm Drainage Improvements - Town of Madison
Infrastructure
Conception
$500,000 est. value
Madison, CT

RFP - FY 23-B026 Solar Photovoltaic Systems
Infrastructure
Bidding
$2,000,000 CJ est. value
Naugatuck, CT 06770

Grove and Adams Street Drainage Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Waterbury, CT 06710

Wrong Way Signs With Flashers in Various Towns Statewide
Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
New Haven, CT 06510

Traffic Highway Signing Replacement and Exit Renumbering on Route 8 - Districts 3 and 4
Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
New Haven, CT 06510

Soil Borings and Rock Cores
Term Contract
Post-Bid
Wallingford, CT

Site Grading
Infrastructure
Post-Bid
Waterbury, CT 06704

Lighthouse Park Maintenance Building Site Work and Foundation
Infrastructure
Results
New Haven, CT 06512

Runway 6/15 - Off Airport Obstruction Removal Bradley International Airport
Infrastructure
Results
$1,891,750 CJ est. value
Windsor Locks, CT 06096

Carmax
Renovation - 9,141 SF
Construction
East Haven, CT 06512

Key Hyundai of Milford
Addition
Pending Verification
$270,000 est. value
Milford, CT 06460

RFQ Engineering - Residential Recycling Transfer Station and Municipal Solid Waste Transfer Station
New Construction, Infrastructure
Bidding
$950,000 CJ est. value
West Haven, CT 06516

Generator and Transfer Switch
Term Contract
Sub-Bidding
West Haven, CT 06516

Yale Campus/Trumbull Street Area Sewer Separation Project: Phase 2
Infrastructure
Post-Bid
$200,000 CJ est. value
New Haven, CT 06510

Excavation Contractor
Term Contract
Results
Wallingford, CT

Last Updated 07/28/2022 04:35 PM
Project Title

O'Reilly Auto Parts #1 / Wallingford

Physical Address View project details and contacts
City, State (County) Wallingford, CT 06492   (New Haven County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *Please contact the GC Bidder(s) directly for access to construction documents. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents