Similar Projects
Last Updated | 05/23/2022 04:02 AM |
Project Title | Water Plant No. 3 Electrical Equipment Replacement |
Physical Address | View project details and contacts |
City, State (County) | Richmond, TX 77407 (Fort Bend County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric, Equipment |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work under this contract may consist of, but are not necessarily limited to, the following tasks: 1. Remove and replace the CenterPoint Service Bus Weather head, along with new exposed conduit and new conductors between the new service and Main Breaker. 2. Remove and replace the existing Main Breaker, along with new conductors between the Main Breaker and the Automatic Transfer Switch (ATS). 3. Remove and replace the existing ATS, along with new conductors from the Generator to the new ATS, and from the ATS to the Motor Control Center (MCC). 4. Disassemble and remove the existing MCC. Provide new MCC in sections that will fit through the existing Control Room door and assemble proposed MCC in existing space. Provide new grounding bushings and conductors. All control and SCADA conductors routed through the MCC are to be removed and replaced. 5. Modify the existing Auto-Sensory Panel (ASP) as shown on the Drawings. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |