Similar Projects
Liquid Chlorine
Term Contract
Sub-Bidding
Springfield, IL 62703

Tree Removal on IL 54
Term Contract
Sub-Bidding
Buffalo, IL 62515

Co Hanley Window Washing Services
Term Contract, Alteration
Post-Bid
Springfield, IL 62703

Elevator Maintenance Services
Term Contract
Post-Bid
Chicago, Springfield, IL 62701

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Klein And Mason Warehouse HVAC Renovations
Renovation, Infrastructure
Results
Springfield, IL 62702

24-Inch Ductile Iron Pipe
Term Contract
Sub-Bidding
Springfield, IL 62703

Water Distribution System Leak Detection
Infrastructure
Post-Bid
Springfield, IL

Line Clearance Services
Term Contract, Infrastructure
Post-Bid
Springfield, IL

Electric Construction Labor
Alteration
Post-Bid
Springfield, IL

D1 Rapid Set Ready Mix Concrete
Infrastructure
Post-Bid
Springfield, IL

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Plumbing Maintenance Services for UIS
Term Contract, Alteration
Post-Bid
Springfield, IL

Public Works Tree Planting
Term Contract, Alteration
Post-Bid
Springfield, IL

Elevator Maintenance Services
Term Contract
Post-Bid
Springfield, IL 62703

Last Updated 12/22/2022 10:07 AM
Project Title

Snow Removal Michael A Bilandic Building and Chicago Medical Center

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

4 year contract for snow removal services at 5 locations that encompass the Chicago Medical Center, and the Michael A Bilandic Building in Chicago, IL. This is a SBSA solicitation. Pursuant to CPO Notice 2020.06, State agencies shall only accept electronic submissions for competitive solicitations. Please see attached Notice of Electronic Submission Only for more details. Snow Removal of 2"- 3.99" accumulation. Cost each time for all parking lots, sidewalks, driveways & loading dock driveways at the Medical Center: J0210, 2121 W Taylor St., Chicago, IL. Please note that sidewalks are required to be cleared of snow from the curb to the lawn. FIRST YEAR Snow Removal of 4"- 5.99" accumulation. Cost each time for all parking lots, sidewalks, driveways & loading dock driveways at the Medical Center: J0210, 2121 W Taylor St., Chicago, IL. Please note that sidewalks are required to be cleared of snow from the curb to the lawn. FIRST YEAR Snow Removal of 6"- 8" accumulation. Cost each time for all parking lots, sidewalks, driveways & loading dock driveways at the Medical Center: J0210, 2121 W Taylor St., Chicago, IL. Please note that sidewalks are required to be cleared of snow from the curb to the lawn. FIRST YEAR Snow Removal of 2"- 3.99" accumulation. Cost each time for all parking lots, sidewalks, and driveways at the Chicago Medical Center: F0100, 1026 S Damen Ave, Chicago, IL. FIRST YEAR Snow Removal of 4"- 5.99" accumulation. Cost each time for all parking lots, sidewalks, and driveways at the Chicago Medical Center: F0100, 1026 S Damen Ave, Chicago, IL. FIRST YEAR

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents