Similar Projects
Repair Sewage Lift Station, Peterson AFB
Post-Bid
Colorado Springs, CO 80914

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Foundry Parking Garage Pump Station
Results
$100,000 to $150,000 est. value
Loveland, CO 80537

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

CM/GC Services for Ralston Raw Water Pump Station and Pipeline
Results
Less than $75,000 est. value
Arvada, CO 80002

Proposals Ashcroft Draw Lift Station
Results
Greeley, CO 80631

Phase 2 Water System Improvements Project
Results
Idaho Springs, CO 80452

Namaqua Hills Pump Station Improvements Project
Results
Loveland, CO 80537

Ralston Treatment Plant Zone 5 Pump Station Replacement
Results
Less than $2,784,707 est. value
Arvada, CO 80002

Tuscany Tract O Irrigation Pump Skid
Results
Evans, CO

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

On-Call Lift and Booster Pump Station Maintenance
Term Contract
Results
Brighton, CO 80601

Northern Water Supply Project North Booster Pump Station (NBPS) Overflow Channel Project
Results
Aurora, CO 80016

Mead Middle School Vertical Turbine Pump Station
Results
Mead, CO 80542

Last Updated 10/08/2021 11:26 AM
Project Title

WTP High Service Pump Addition

Physical Address View project details and contacts
City, State (County) Littleton, CO 80125   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $787,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes the following Work: Installation of an owner furnished 150 hp vertical turbine pump; relocating an existing 50 hp vertical turbine pump assembly; removal, relocation and replacement of certain steel process piping, valves, fittings, and equipment; revisions to existing electrical equipment and wiring; and new electrical equipment, wiring and controls.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents