Similar Projects
Pavement Preservation and Rehabilitation North - 2021
Infrastructure
Bidding
$500,000 est. value
Arlington Heights, Mount Prospect, Palatine, Schaumburg, Streamwood, IL 60056

Resurfacing
Infrastructure
Bidding
$4,000,000 est. value
Schaumburg, IL 60194

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Green Alley Reconstruction
Results
Less than $475,000 est. value
Harwood Heights, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Realignment of Shared-use Path, Pavement Reconstruction, and Retaining Wall
Infrastructure
Bidding
$4,000,000 est. value
Glencoe, IL

2021 Pietrini School Traffic Flow Alteration
Post-Bid
Franklin Park, IL 60131

2.5 Miles of Resurfacing, Patching and ADA Improvements on IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake-Cook Road, in the Village of Palatine
Results
IL

Construct an Aggregate and PCC Shared-use Path, Inlcudes Curb and Gutter, Traffic Signal Enhancements, Pavement Markings and Signing
Infrastructure
Bidding
$4,000,000 est. value
Chicago, IL

Pavement W/ Hot-Mix Asphalt
Post-Bid
Homewood, IL

(1.5-Mile) SMART Resurfacing and ADA Improvements
Results
Des Plaines, Niles, Park Ridge, IL 60714

Fullerton Avenue Resurfacing
Infrastructure
Bidding
$425,000 est. value
Northlake, IL 60164

Reconstruction of Sixteen Existing Local Roads With Full-Depth Asphalt and Will Include Removals, Earthwork
Post-Bid
Arlington Heights, IL

(2.7-Mile) Smart Overlay and ADA Improvements on 87th Street from Keeler Avenue to Damen Street in the Village of Evergreen Park, and the Cities of Chicago and Hometown
Results
Chicago, Hometown, IL 60453

Last Updated 06/16/2022 12:52 AM
Project Title

FY 2023 PMP Resurfacing Program

Physical Address View project details and contacts
City, State (County) Tinley Park, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $520,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of street resurfacing by hot-mix asphalt and replacement, patching, miscellaneous concrete replacement, aggregate shoulders, structure adjustments/reconstructions, and necessary restoration as directed by the Engineer. Various locations throughout Tinley Park. Use the seven-digit QuestCDN project number 8202396 to locate the job on the QuestCDN website search page. ids will not be accepted from any prospective bidder who has not purchased contract documents through QuestCDN. Please contact the Village of Tinley Park (708) 444-5500 (Arlan Schattke or Colby Zemaitis) for additional information.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents