Similar Projects
Concrete Work for the Mae Meissner Whitaker Park
Infrastructure
Design
$400,000 CJ est. value
Bunker Hill, IL 62014

Noble Academy High School - ROF - (Category A)
Renovation
Bidding
$3,478,000 CJ est. value
Chicago, IL 60610

Concrete Microsilica Overlay, Bridge Joint Replacement and Bridge Repair on IL 125
Infrastructure
Bidding
$400,000 CJ est. value
Virginia, IL 62691

UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Weir Concrete Repairs
Alteration
Post-Bid
IL

IVHM FY22 Concrete
Alteration
Results
Manteno, IL 60950

Advanced Technology Center Site Concrete and Asphalt
Infrastructure, Alteration
Results
Gurnee, IL 60031

RFQ Contractor - Hernandez-West Park-ICR
Renovation
Bidding
$1,500,000 CJ est. value
Chicago, IL 60632

Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

Downtown Plaza
Renovation, Infrastructure
Results
Carbondale, IL

Pedestrian Signal at Randall Road and Dogwood-Ritter
Infrastructure
Bidding
$5,000,000 CJ est. value
North Aurora, IL 60542

Riley IS & Northlake MS Concrete Work - Bid Release #5
Alteration
Post-Bid
Northlake, IL 60164

Concrete Work - Zion Fire Station #2
Alteration
Results
Zion, IL 60099

RFP Construction Manager - Construction Management Services At-Risk for Terminal 3 Improvements
Renovation
Bidding
$3,000,000 CJ est. value
Des Plaines, IL 60018

2021 Crushing Concrete
Alteration
Post-Bid
Effingham, IL

Last Updated 02/15/2023 06:06 PM
Project Title

24th Street and 25th Street Alley and Utility Improvements

Physical Address View project details and contacts
City, State (County) East Moline, IL 61244   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,244,349 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacement of two alleys with PCC pavement, watermain replacement and associated water service connections, sanitary sewer replacement and associated sewer service connections, and storm sewer installation. Work quantities include, but not limited to, approximately 1,340 LF of 8 watermain, 1229 LF of 8 sanitary sewer, 495 LF of 12 storm sewer installation, 1,520 SY of PCC alley pavement, driveway replacement and other related construction items. A bid bond or certified check payable to the City Clerk of the City of East Moline, Illinois in the amount of 5% of the bid amount shall be submitted with each proposal. Bids shall be valid for 60 days. The City of East Moline will not discriminate against any person because of race, color or religion, sex or national origin. All contracts for the Construction of Public Works in the City of East Moline are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The contract will be awarded based upon the bid that will be in the best interest of the City of East Moline, and the City reserves the right to waive any irregularities in the bids and to reject any or all bids and to determine which is lowest and/or best for the proposed project.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents