Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
Sioux City, IA

Clearing and Grubbing - I-35
Infrastructure
Bidding
$250,000 to $500,000 est. value
Ellsworth, IA 50075

Grading - I-35
Infrastructure
Bidding
$1,500,000 to $2,000,000 est. value
Des Moines, IA 50982

Johnson County Historic Poor Farm Site Development
Infrastructure
Post-Bid
Iowa City, IA

LTC Building Demolition and Grading
Demolition, Infrastructure
Post-Bid
Grundy Center, IA

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Woodbury County Law Enforcement Center Offsite Improvements
Infrastructure
Results
Sioux City, IA 51100

156th Street and Waterford Road - TR19-01 - City of Urbandale
Infrastructure
Conception
Urbandale, IA 50323

Clearing and Grubbing - I-35
Infrastructure, Alteration
Bidding
$125,000 to $250,000 est. value
IA

Sheldon Water Tower
New Construction, Infrastructure - 1,100 SF
Post-Bid
$3,600,000 to $3,800,000 est. value
Hospers, IA 51238

Seminole River Bank - Armoring and Access Improvements
Infrastructure
Results
$880,000 est. value
Cedar Rapids, IA

Roads - City of Fort Dodge
Alteration
Conception
$141,450 est. value
Fort Dodge, IA 50501

Clearing and Grubbing - IA-22
Infrastructure
Bidding
$40,000 est. value
Buffalo, IA 52728

Reported 07/07/2022 04:33 PM
Project Title

Tremont Street Bridge Replacement - 82 - City of Cedar Falls

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $432,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a bridge / tunnel in Cedar Falls, Iowa. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel. This project will replace the existing bridge with a twin 1 OX8 box culvert. The current bridge is in poor condition with advanced deterioration. Design for this project will occur in-house. Additional work includes the infill of city sidewalk at the gap at 422 West 20th Street. As of July 06, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents