Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

LLBO Construction Industry Workforce Training Facility
New Construction
Conception
Duluth, Grand Rapids, Minneapolis, MN

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

RFQ - Architectural and Engineering Services
Term Contract
Bidding
Richfield, MN 55423

Master Contract II for Bass Lake Spur Freight Rail Maintenance and Repair Rebid 2
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Construction Coordinator Services
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Tree Maintenance Equipment, Attachments, and Accessories
Term Contract
Post-Bid

Repair Parts, Access, Brooms, Labor Elgin Sweepers
Term Contract
Post-Bid
$50,000 to $75,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

CDBG 2021 - Consolidated Pool
Results
MN

New Hope Public Works Facility Phase 1 Improvements
Renovation
Construction
Minneapolis, MN 55428

MN Valley ES Addition
New Construction, Renovation, Addition
Construction
$1,000,000 to $5,000,000 est. value
Minneapolis, MN 55437

Cleaning and Snow Removal Services at Marquette and 2nd
Term Contract
Sub-Bidding
Minneapolis, MN 55403

Furnish And Delivery Of Snow Fencing Materials
Term Contract
Post-Bid

USPS IQ JOC Minnesota
Renovation
Results

Last Updated 08/09/2022 04:41 PM
Project Title

RFP - Decarbonization Master Planning for the Energy Center

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Misc. Buildings, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Decarbonization Master Planning for Energy Center QUESTIONS DUE: August 10, 2022 by 4PM SUBMIT QUESTIONS TO: christine.longwell@hennepin.us and dave.mcnary@hennepin.us Proposers are strongly encouraged to make their submissions well in advance of the proposal due date as the process may take some time to complete. The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents