Similar Projects
Hazel Green - Platteville Construction / Resrf20
Infrastructure
Conception
$7,000,000 CJ est. value
Livingston, WI 53554

Dickeyville - Lancaster Const / Intersection Improvem / Recst
Infrastructure
Conception
$3,000,000 CJ est. value
Lancaster, WI 53813

Red Barn Wind Farm
Infrastructure
Design
$162,000,000 CJ est. value
Wingville, WI 53569

Cassville - Lancaster Const / Mill and O'lay / Rsrf
Infrastructure
Design
$4,000,000 CJ est. value
Lancaster, WI 53813

City of Fennimore, Brownwood Road, Bronson Blvd. to Termini
Infrastructure
Bidding
$250,000 CJ est. value
Fennimore, WI 53809

Prairie du Chien, Irish Ridge Road; STH 27 to Bouska Road
Infrastructure
Bidding
$500,000 CJ est. value
Boscobel, WI 53805

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Scot Substation Earthwork
Infrastructure
Results
Muscoda, WI

Larch Court Construction
Infrastructure
Results
$301,820 est. value
Lancaster, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Conception
$7,000,000 CJ est. value
Lancaster, WI 53813

Last Updated 10/06/2022 04:05 PM
Project Title

Lead Service Line Replacements

Physical Address View project details and contacts
City, State (County) Boscobel, WI 53805   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $32,300 [brand] Estimate
Plans Available from Agency's Affiliate - 08/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

Goals – 6.9% Female and .5% Minorities. Lead Service Line Replacements at five (5) separate property locations No bid shall be withdrawn for a period of thirty (30) days after the opening of said bids, without the consent of the Director of Public Works. The City reserves the right to reject any or all bids, to waive any informalities in bidding, and to accept the bid deemed most advantageous to said City. The BIDDER'S attention is called to the "Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246)" contained in the bid documents, which sets forth, in part, goals and timetables for the employment of women and minorities in the project area. (Employment Goals - 6.9% Female and .5% Minorities.) In accordance with the Wisconsin State Statutes 66.0901, all BIDDERS must submit to the Board of Public Works - Proof of Responsibility - on forms furnished by the City. If the Contractor has previously qualified with the City, it is not necessary to file a "BIDDER'S PROOF OF RESPONSIBILITY." Funding for this project is all or in part due to a Safe Drinking Water Loan received by the City of Boscobel, Wisconsin from the Department of Natural Resources. In accordance with the Wisconsin Statutes 66.0903, Contractors and Subcontractors are required to pay not less than the PREVAILING WAGE RATES on Public Works Projects in accordance with DAVIS BACON AND RELATED ACTS (DBRA) and FEDERAL DECISION NUMBER WI20220022 (as modified 06/17/2022), copy of which is part of this proposal. This project incorporates American Iron and Steel Requirements. Each proposal shall be accompanied by a CERTIFIED CHECK or BID BOND in the amount of 5% of the maximum bid, and said check shall be forfeited to the City of Boscobel in the event the BIDDER shall fail to enter into a contract in accordance with the terms of the proposal after bid has been accepted by the City of Boscobel. No bid shall be withdrawn after the opening of bids for a period of thirty (30) days after the scheduled time without consent of the City. here will be a Pre-Construction Conference held on September 21, 2022, at 1:00 P.M. at the office of the Director of Public Works, 1006 Wisconsin Ave., Boscobel, Wisconsin.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents