Similar Projects
Irrigation Pump Station at Oak Grove Park
Alteration
Bidding
Centerville, OH 45458

Three Domestic Booster Pump Skids
Infrastructure
Bidding
Cincinnati, OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Rough Vacuum Pumps for VF-6 and Building 301
Term Contract
Post-Bid
Cleveland, OH 44135

Cleaning and Redevelopment of Wells #3 and #8
Results
Less than $68,956 est. value
Xenia, OH 45385

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

Construction at the Franklin County Sanitary Landfill
Infrastructure
Bidding
OH

Influent Screw Pump Installation
Infrastructure
Post-Bid
Chillicothe, OH

Vertiflo 720 Duplex Pump and Control System
Results
Less than $89,192 est. value
Dayton, OH

Orphan Well Abandonment - Phase I
Alteration
Bidding
$28,500,000 est. value

Oharng Mogas Storage Tank Maintenance and Pump Relocation
Infrastructure
Post-Bid
Port Clinton, OH

PUB Well Field Control Tower (Wells 17-20)
Results
Less than $380,911 est. value
Batavia, OH 45103

Gartner Well Field Potable Well
Infrastructure
Bidding
Heath, OH

SD7 Influent Pump Station Improvement
Infrastructure
Post-Bid
$1,080,000 est. value
OH

2020 GCCS Construction - Fall 2020 Wellfield Improvements
Results
$535,000 est. value
Painesville, OH 44077

Last Updated 03/11/2022 09:30 AM
Project Title

Water Well 9 Rehabilitation

Physical Address View project details and contacts
City, State (County) Sidney, OH 45365   (Shelby County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

may be impossible to conduct): 1) Remove in-place well pump and set aside for evaluation and repair as needed; 2) Pre-cleaning video inspection; 3) Inspect, clean, and repair or replace pump and discharge pipe components as required (separate estimate upon inspection); 4) Airlift and cable tool surging to remove surficial material; 5) Application of a well cleaning treatment program (details following), including cable-tool double surge disk with airlift redevelopment (alternatives for part of the process may be proposed); 6) Chlorine disinfection; 7) Post-cleaning video inspection; 8) Assisting with post-cleaning pumping tests as needed and reinstallation of permanent pumps

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents