Similar Projects
I-75 MLK DDI
Bidding
FL

Construction UATC ADA Sidewalk Improvements
Infrastructure
Bidding
Tampa, FL 33612

City Parking Lot Projects
Post-Bid
Plant City, FL 33563

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Post-Bid
$2,249,150 est. value
Ruskin, FL 33570

FY19 CDBG Area Proposed Sidewalk Improvements Design-Build
Results
Less than $735,407 est. value
Temple Terrace, FL 33617

Sidewalks Construction Near Kenly Elementary - Various Locations (LAP)
Results
Less than $346,108 est. value
Tampa, FL 33619

Continuing Contract for Miscellaneous Concrete Flat Work
Term Contract
Bidding
Temple Terrace, FL

The Sanctuary at James H Shimberg Estates Parking Lot Resurfacing
Infrastructure
Post-Bid
Tampa, FL 33604

Sidewalks Near Mort Elementary - Various Locations (LAP)
Results
Less than $573,976 est. value
Tampa, FL 33613

Ybor City Streetscape Improvements - 7th Avenue from 24th Street to 26th Street
Infrastructure
Bidding
$789,000 est. value
Tampa, FL

Sidewalk Construction - Gibsonton Elementary (LAP)
Results
Less than $346,198 est. value
Gibsonton, FL 33534

Curb/Sidewalk Maintenance and Restoration (SMS)
Infrastructure
Bidding
Tampa, FL

Sidewalk Construction - Lutz Lake Fern Road Trail (LAP)
Results
Less than $94,668 est. value
Tampa, FL 33600

Midtown District Development
Results
Plant City, FL

Flexible Paving/Cement Concrete Pavement/Widening of Existing Entrance and Exit Ramps at I-75 SB Rest Area
Results
Less than $13,085,100 est. value
FL

Last Updated 06/07/2021 10:41 AM
Project Title

Construction, Bruce B. Downs Boulevard Intersections and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Tampa, FL 33608   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,776,048
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for work to be performed at the intersection(s) of Bruce B Downs Boulevard (BBD) from USF Pine Drive to Holly Drive and E. 131st Ave., and BBD at Campus Hill Drive and at BBD at Richard Silver Way. All work shown in the project plans provided shall be constructed as one continuous project, with coordinated Maintenance of Traffic (MOT), and not as separate projects. The signal and intersection improvements at BBD and Richard Silver Way/VA Hospital shall be prioritized, and constructed first, with the remaining work in the corridor either occurring simultaneously or subsequently. 2). The work performed under this contract may include, but may not be limited to: Intersection Improvements; Sidewalk and curb Improvements; Clearing and Grubbing; Earthwork; Sodding; Milling & Resurfacing; Signalization; Pavement Markings and Signing. Utility coordination incidental to the construction; Incidental coordination with municipalities in Hillsborough County including inter-local agreements; Restoration and cleanup of the construction sites.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents