Similar Projects
NW Transmission - 12" along 30th Street and CR10A - City of Minot
Infrastructure
Conception
$2,245,400 CJ est. value
Minot, ND 58701

3rd Street East and Central Avenue Reconstruction - E-13 - City of Minot
Infrastructure
Conception
$11,760,000 CJ est. value
Minot, ND 58703

Broadway Circle Affordable Housing
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Minot, ND 58701

The Tracks
New Construction, Infrastructure - 53,277 SF
Design
$200,000,000 CJ est. value
Minot, ND 58701

Building C Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,600,000 CJ est. value
Minot, ND 58701

MiSU Student Center Structural Floor Over Existing Pool
Infrastructure
Bidding
$100,000 CJ est. value
Minot, ND 58703

2022 Exploratory Drilling AML
Term Contract, Infrastructure
Post-Bid

Valvoline Instant Oil Change Center Rebid
New Construction, Infrastructure
Post-Bid
$1,600,000 CJ est. value
Minot, ND 58701

Pavement Marking
Infrastructure
Results
$307,945 CJ est. value
Mandaree, ND 58757

Minot International Airport - 2022 Runway Pavement Rehabilitation
Infrastructure
Results
$84,480 CJ est. value
Minot, ND 58703

Landfill Transfer Station Construction - 4580 - City of Minot
New Construction, Infrastructure
Construction
$4,200,000 CJ est. value
Minot, ND 58701

Broadway Watermain Upsizing 36th Avenue NW to 19th Avenue - W-2 - City of Minot
Infrastructure
Construction
$988,885 CJ est. value
Minot, ND 58701

M by Epic Apartments
New Construction, Infrastructure, Renovation - 10,000 SF
Pending Verification
$14,700,000 CJ est. value
Minot, ND 58701

40th Avenue Mixed-Use
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Minot, ND 58701

Burdick Expressway Viaduct Rehabilitation - E4 - City of Minot
New Construction, Infrastructure
Conception
$2,064,000 CJ est. value
Minot, ND 58701

Last Updated 07/12/2023 04:18 PM
Project Title

North Main Street Industrial Development

Physical Address View project details and contacts
City, State (County) Minot, ND 58703   (Ward County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project appeared before the Planning Board for the city Minot on January 4, 2023, and is under review. No other applications or building permits have been submitted. An architect has been selected; however, information regarding the general contractor has not been disclosed. A firm construction timeline has not been set, however construction is not expected to begin prior to late 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents