Similar Projects
Last Updated | 12/19/2022 07:37 AM |
Project Title | South 2nd Street West & Cottonwood Street Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Missoula, MT 59801 (Missoula County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Selection Underway, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $694,311 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: The installation of new water main to replace existing water main in Cottonwood Street from South 3rd Street West to South 2nd Street West, in South 2nd Street west from South Orange Street to Hickory Street, in Hickory Street from south 2nd Street West to South 1st Street West and in South 1st Street from Hickory Street to Walnut Street. New 8-inch Ductile Iron Pipe (D.I.P) will replace existing mains. The existing services will be swapped and connected to the new mains. Associated appurtenances and valves necessary to complete to proposed main are detailed in construction plans. Surface restoration of disturbed areas including asphalt, concrete, gravel, landscaping, and irrigation, and other miscellaneous work is also shown on project drawings Liquidated damages : 1000$ |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |