Similar Projects
Horace Mann Condensing Unit Replacement
Alteration
Bidding
$639,154 est. value
Westfield, MA

Select Siding Replacement on 4 Buildings
Alteration
Bidding
$22,000 est. value
Barre, MA

Harbormaster Building and Site Revitalization Project - Filed Sub Bids
Alteration
Sub-Bidding
$1,200,000 est. value
Eastham, MA 02642

Replace Two Air Conditioning Condensers at 36 Harold Lane
Post-Bid
Less than $25,842 est. value
Chatham, MA 02633

Server Room HVAC Repair
Post-Bid
Less than $25,000 est. value
Ayer, MA 01434

HVAC System Replacement at the District 5 Administration Building
Results
Less than $380,000 est. value
Taunton, MA 02718

Boiler Replacement, The Pines 667-2
Results
Less than $71,883 est. value
Wilbraham, MA

As Needed Plumbing/Heating Services
Alteration
Bidding
$40,000 est. value
Pittsfield, MA

Duct Work Cleaning of Commercial Heating, Ventilating and Air Conditioning Systems, Diesel Exhaust Systems and All Exhaust Fans/Systems
Post-Bid
Less than $80,000 est. value
Boston, MA

City Hall Fire Escape Construction
Results
Less than $67,000 est. value
Somerville, MA 02143

Boiler, Furnace, and HVAC Maintenance
Term Contract
Bidding
$1,100,000 est. value
Danvers, MA

Winchester High School Dust Collector System Installation
Post-Bid
Less than $40,000 est. value
Winchester, MA

HVAC Repairs, Inspections, Project Services FY 21
Term Contract
Results
Less than $400,000 est. value
Mansfield, MA 02048

Air-Cooled Systems
Post-Bid
Less than $150,000 est. value
Braintree, MA

HVAC Service and Repair Annual Contract
Term Contract
Results
Mashpee, MA

Reported 10/07/2021 08:56 AM
Project Title

Chilmark School HVAC and Building Envelope Improvements

Physical Address View project details and contacts
City, State (County) Vineyard Haven, MA   (Dukes County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, HVAC
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing abandoned attic equipment; Install insulation in roof and gable walls; Install new thermostats in classrooms and common spaces.

Details

Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents