Similar Projects
FY21 Stormwater Improvements
Bidding
Ayer, MA

Repair, and Rebuilding Catch Basins and Manholes
Post-Bid
$150,000 est. value
Lowell, MA

Storm Water System and Ancillary Piping
Post-Bid
Less than $45,000 est. value
Stow, MA 01775

Stormwater Detention Basin Rehabilitation
Results
Less than $100,000 est. value
Tewksbury, MA 01876

Catch Basin Cleaning Services
Term Contract
Results
$50,000 est. value
Chelmsford, MA

Catch Basin Cleaning - Annual Contract
Term Contract
Post-Bid
Melrose, MA 02176

FY20 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance
Results
Less than $325,000 est. value
Cambridge, MA

Performance of Preventative Maintenance, Cleaning and Inspection of the Oil/Water Separator System, Clean Out of Storm Drains and Manhole Distribution (Catch) Basin
Post-Bid
Less than $30,000 est. value
Reading, MA 01867

North Creek Stormwater Outfall Restoration
Results
Less than $300,000 est. value
Everett, MA 02149

Catch Basin Cleaning Services
Post-Bid
Billerica, MA

Hospital Road Improvements Project
Results
Less than $650,000 est. value
Devens, MA 01432

Stormwater Treatment Units
Results
Ayer, MA 01432

Catch Basin and Drain/Pipe Cleaning
Term Contract
Results
$7,004 est. value
Medford, MA

Catch Basin Cleaning
Results
$59,250 est. value
Westford, MA 01886

Sewer Pipes and Supplies
Results
Somerville, MA

Last Updated 09/02/2020 11:28 AM
Project Title

SPY Pond Dredging and Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Arlington, MA 02474   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,448,535
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $7500","100." "0.200","a","Clearing And Grubbing","101." "16.000","Hr","Control Of Invasive Plants Existing On Site","102.3" "8.000","Hr","Invasive Plant Management Strategy","102.33" "10.000","Ea","Tree Protection - Armoring And Pruning","102.511" "190.000","Ft","Tree And Plant Protection Fence","102.521" "250.000","Cy","Unclassified Excavation","120.1" "24.000","Cy","Test Pit For Exploration","141.1" "28.000","Cy","Class b Trench Excavation","142." "5.000","Ea","Drainage Structure Removed","146." "750.000","Cy","Dredging Of Material","148.01" "1.000","Ls","Bathymetric Post-Construction Survey","148.02" "1.000","Ls","Pond Dredging, Mobilization And Demobilization","148.41" "24.000","Cy","Ordinary Borrow","150." "290.000","Cy","Gravel Borrow","151." "25.000","Cy","Gravel Borrow - Type c","151.01" "70.000","Ton","Crushed Stone","156." "1.000","Ls","Environmental Health And Safety Program","180.01" "100.000","Hr","Personal Protection Level c Upgrade","180.02" "80.000","Hr","Licensed Site Professional Services","180.03" "15.000","Ton","Disposal Of Unregulated Soil","181.11" "470.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "470.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "470.000","Ton","Disposal Of Hazardous Waste","181.14" "310000.000","Gal","Treatment Of Contaminated Groundwater","183.1" "100.000","Lb","Disposal Of Granular Activated Carbon","183.2" "7.000","Ea","Catch Basin","201." "6.000","Ea","Frame And Grate - Massdot Bar Type","222." "1.000","Ea","Removal Of Trash Rack","227.01" "6.000","Cy","Removal Of Drainage Structure Sediment","227.3" "55.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "60.000","Ft","12 Inch Drainage Pipe - Option","234.12" "3.000","Cy","High Early Strength Cement Concrete Base Course","431.11" "1.000","Mgl","Water For Roadway Dust Control","443." "190.000","Ton","Hma For Patching","451." "5.000","Gal","Asphalt Emulsion For Tack Coat","452." "345.000","Ft","Hma Joint Sealant","453." "15.000","Ton","Asphalt Mixtures For Temporary Work","472." "10.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "18.000","Ft","Granite Edging Type Sb - Straight","511.1" "5.000","Ea","Granite Curb Inlet - Straight","514." "84.000","Ft","Edging Removed And Discarded","597." "1.000","Ea","Trailing Anchorage","627.11" "60.000","Ft","Highway Guard Removed And Reset","630." "11.000","Ea","Guardrail Post - Steel","632." "11.000","Ea","Guardrail Offset Block - w Beam","633." "1800.000","Ft","Temporary Fence","657." "500.000","Ft","Temporary Fence Removed And Reset","657.5" "600.000","Ft","Chain Link Fence Removed And Reset","666." "4.000","Ea","Silt Sack","697.1" "410.000","Ft","Turbidity Curtain","697.21" "210.000","Sy","Geotextile Fabric For Separation","698.3" "80.000","Sy","Cement Concrete Sidewalk","701." "3.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "110.000","Cy","Loam Borrow","751." "70.000","Cy","Compost Top Dressing","751.72" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "2500.000","Sy","Seeding","765." "125.000","Sy","Seeding - Roadside Riverbank - Part Shade Mix","765.442" "60.000","Sy","Seeding - Wetland Mix – Seasonally Flooded","765.554" "2700.000","Ft","Sediment Control Barrier","767.121" "1400.000","Ea","Double Stacked Hay Bales","767.85" "1.000","Ls","Temporary Protective Measures","767.95" "5.000","Ea","Maple - Red 6-7 Feet","775.511" "3.000","Ea","Oak – Swamp White 7-8 Feet ","777.259" "1.000","Ea","Planetree - American 5-6 Feet","777.439" "3.000","Ea","Birch – River- 4-5 Feet","778.159" "8.000","Ea","Shad Tree - Downy 4-5 Feet","783.043" "2.000","Ea","Tupelo 4-5 Feet","783.463" "8.000","Ea","Inkberry 18-24 Inch","785.631" "14.000","Ea","Bayberry Shrub - Northern 18-24 Inch","789.331" "27.000","Ea","Chokeberry - Black 18-24 Inch","789.807" "12.000","Ea","Dogwood - Redosier 18-24 Inch","790.631" "5.000","Ea","Dogwood - Silky 2-3 Feet","790.719" "13.000","Ea","Spicebush 24-30 Inch","793.714" "3.000","Ea","Sumac Shrub - Staghorn 2-3 Feet","794.633" "23.000","Ea","Summersweet Shrub 2-3 Feet","794.735" "1.000","Ea","Winterberry - Male 18-24 Inch","795.151" "12.000","Ea","Winterberry - Female 18-24 Inch","795.155" "55.000","Ea","Switch Grass 5 Inch Plug","796.454" "121.000","Ea","Sedge – Pennsylvania 5 Inch Plug","796.483" "50.000","Hr","Roadway Flagger","850.41" "10.000","Day","Traffic Cones For Traffic Management","851.1" "800.000","Sf","Safety Signing For Traffic Management","852." "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "950.000","Ft","Temporary Barrier (Tl-2)","853.2" "200.000","Ft","Temporary Barrier Removed And Reset","853.21" "25.000","Day","Truck Mounted Attenuator","853.403" "10.000","Day","Temporary Illumination For Work Zone","853.8" "5.000","Day","Temporary Portable Rumble Strip","854.6" "10.000","Day","Arrow Board","856." "15.000","Day","Portable Changeable Message Sign","856.12" "400.000","Day","Reflectorized Drum","859." "10.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "55.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "10.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "1.000","Ea","Traffic Sign Removed And Reset","874.2" "160.000","Ton","Modified Rockfill","983.5" "1.000","Ls","Dewatering And Water Management","991.09" "1.000","Ls","Scour Improvements","991.23"

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents