Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Outdoor Restroom Buildings
Results
Greer, SC

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

FY20 Construction MATOC
Post-Bid
$1,000,000 to $5,000,000 est. value
Eastover, SC 29044

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Renovate Public Works Building
Renovation
Post-Bid
Mauldin, SC

Activities Center Renovation
Renovation
Results
Fountain Inn, SC 29644

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

South Atlantic Regional Construction IDIQ
Results
$50,000 to $80,000,000 est. value

Reported 08/21/2021 12:00 AM
Project Title

Bathroom Modification

Physical Address View project details and contacts
City, State (County) Simpsonville, SC   (Greenville County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Misc. Buildings, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $20,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Widen doorway, move light switch, toilet replacement, replace tub/shower with cultured marble shower.

Details

Misc. Buildings, New Construction, Restroom/Bath House, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents