Similar Projects
Civic Campus HVAC System Upgrade Project - Rebid
Renovation
Design
$80,000 CJ est. value
Pacific, WA 98047

Lowell & View Ridge ES Ceiling Fan
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Seattle, WA 98102

Bathroom Fan Replacement Gilman Square
Renovation
Sub-Bidding
$69,592 CJ est. value
Issaquah, WA 98027

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

OMFC LCC HVAC Replacement
Alteration
Results
$2,647,102 est. value
Seattle, WA 98134

HVAC Replacement Rooftop Heat Pump and A/C Units
Renovation
Construction
$132,868 CJ est. value
Renton, WA 98057

South Shore K-8 Chiller Replacement
Renovation
Construction
$225,350 CJ est. value
Seattle, WA 98118

Mount Baker Middle School Boiler Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Auburn, WA 98002

Haller Elementary HVAC Upgrades
Alteration
Post-Bid
Bellevue, WA 98008

Air Terminal Units (VAV Boxes) Replacement Project
Alteration
Results
$250,000 to $500,000 est. value
Auburn, WA 98092

Hazen High School - Domestic Water Entrance and Water Heater Upgrades
Renovation
Construction
$255,137 CJ est. value
Renton, WA 98059

Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Post-Bid
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

Architecture Hall HVAC Improvements
Alteration
Results
$885,000 est. value
Seattle, WA 98195

Last Updated 02/23/2023 09:03 AM
Project Title

Renton Park Elementary School Replace Boilers and DHW Heaters

Physical Address View project details and contacts
City, State (County) Renton, WA 98058   (King County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $489,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not limited to: Replace existing boilers with new high efficiency condensing boilers. Replace existing water heaters with new high efficiency condensing water heaters replace existing primary heating water pumps. Replace existing heating water expansion tank. Replace gas piping and gas regulators. Provide new mechanical controls Deposits will be returned to Bidders upon return of the Bid Documents to ARC in good condi tion within 10 days following Bid Opening. Bid Bond: Each contractors bid of $150,000.00 or more must be accompanied by a certified check, bank cashiers check, or bid bond, equal to 5% of the total Base Bid only, excluding taxes. Make checks payable to the Renton School District; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Prevailing Wage: It is the responsibility of the bidder to go online to verify they have the most current prevailing wages at time of bid. Apprenticeship Requirement: This Project is not estimated to cost one million dollars or more. This Project is not subject to the apprenticeship requirements of RCW 39.04.320. Right to Reject. The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. Withdraw of Bid: No Bid may be withdrawn, except with the express permission of the Owner, after the time set for the open ing thereof, unless the award, of Contract is delayed for a period exceeding 45 days THE PROJECT DESCRIPTION IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL REFER TO THE CONSTRUCTION DOCUMENTS INCLUDING DRAWINGS FOR THE DETAILED SCOPE OF WORK. IN CASE OF CONFLICT BETWEEN THIS DESCRIPTION, THE DRAWINGS AND THE SPECIFICATIONS, THE MOST STRINGENT CONDITION SHALL APPLY. RENTON PARK ELEMENTARY SCHOOL BOILER AND WATER HEATER REPLACEMENT PROJECT SCOPE INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING TASKS: 1. REPLACE EXISTING BOILERS WITH NEW HIGH EFFICIENCY CONDENSING BOILERS 2. REPLACE EXISTING WATER HEATERS WITH NEW HIGH EFFICIENCY CONDENSING WATER HEATERS. 3. REPLACE EXISTING PRIMARY HEATING WATER PUMPS. 4. REPLACE EXISTING SECONDARY HYDRONIC WATER PUMPS. 5. REPLACE EXISTING HEATING WATER EXPANSION TANK. 6. REPLACE GAS PIPING AND GAS REGULATORS. 7. PROVIDE NEW MECHANICAL CONTROLS. Anticipated Notice of Award: On or about January 17, 2023

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents