Similar Projects
Pedestrian Safety Improvement
Bidding
$454,757 est. value
FL

Demolition of 500 East Bay Street
Bidding
Jacksonville, FL 32202

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Lenox Avenue Sidewalk Improvments - JSEB Set Aside
Post-Bid
Jacksonville, FL 32202

Demolition of Three Townhome Properties - 7219 East Ken Knight Drive, 4516 Wrico Drive and 7227 East Ken Knight Drive
Demolition
Results
Jacksonville, FL

Demolition of 11635 Tanager Drive
Results
Jacksonville, FL

Love Bridal Boutique
Renovation - 3,760 SF
Construction
$396,000 est. value
Jacksonville Beach, FL

Live Oak Dr Sidewalk Improvements
Bidding
Jacksonville, FL 32246

Lowe's #2472 - Parking Lot Rehabilitation
Renovation
Post-Bid
Jacksonville, FL 32218

Demolition of Four Town Home Properties - 7209 Ken Knight Drive East 7213 Ken Knight Drive East 7144 Ken Knight Drive East and 11635 Tanager Drive
Demolition
Results
Less than $24,500 est. value
Jacksonville, FL 32202

Demolition of Nine (9) Flood Prone Properties
Bidding
Jacksonville, FL 32207

Demolition of Two Adjoined Properties
Demolition
Post-Bid
Jacksonville, FL 32244

San Pablo Right Turn Lane Project
Results
Less than $89,370 est. value
Jacksonville, FL

Bike Lane/Sidewalk/Milling and Resurfacing
Bidding
$1,608,860 est. value
FL

Demolition of One Townhome Property-4540 Wrico Drive - JSEB Set-Aside
Post-Bid
Jacksonville, FL 32209

Last Updated 01/07/2021 11:34 AM
Project Title

McCoy's Creek Boulevard Closure

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,567,605
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for the demolition of McCoy's Creek Blvd. The work includes, but is not limited to demolition and removal of McCoy's Creek Boulevard from Fitgerald Street to Claude Street, and Goodwin Street to Margaret Street; construction of six at Sunshine, Crystal, Leland, Smith, Broward, and Nixon streets including installation of concrete sidewalk, curb, and gutter to the extent shown on the project plans (typically to closest intersection) ; minor utility adjustments; installation of sod; maintenance of traffic, erosion and sediment control.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents