Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

The Proctor
New Construction, Infrastructure - 142,000 SF
Bidding
$55,000,000 CJ est. value
Atlanta, GA 30318

The Proctor
New Construction, Infrastructure - 142,000 SF
Bidding
$55,000,000 CJ est. value
Atlanta, GA 30318

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Gateway Pedestrian Bridge
Results
$13,675,825 est. value
College Park, GA

980 Crest Valley Drive Stormwater Improvement Project
Infrastructure
Results
$279,562 CJ est. value
Atlanta, GA 30327

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Commercial Row Commons
Renovation
Construction
Atlanta, GA 30309

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Parkwood / Hardee Street
Demolition, New Construction, Infrastructure - 8,745 SF
Design
$12,900,000 CJ est. value
Atlanta, GA 30307

RFP Design - Construction Professional (CP) Services for Atlanta Unbound Academy, Construction of New K-8 School
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
College Park, GA 30337

Last Updated 05/05/2023 09:03 AM
Project Title

Encore Parkway Greenway Connection/Park - City of Alpharetta

Physical Address View project details and contacts
City, State (County) Alpharetta, GA 30009   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,003,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Establishing a more direct connection to the Big Creek Greenway will help activate the North Point Parkway Corridor. Due to the topographic constraints as well as existing creeks, flood plain, wetlands, sanitary sewer lines, and walking trails/bridges, the 12' wide greenway trail will be elevated. The approximate length of the Greenway Connection from the intersection of Encore Parkway and North Point Parkway is approximately 1,400 linear feet. Also included in the project is developing focal features to bring attention to the Greenway connection. The construction estimate is approximately $4.3M for the Greenway, entry feature, raised trail, and park. Funding is comprised of Impact Fees (estimated at $2 million) to cover the park features and T-SPLOST 1 (estimated at $2.3 million) to cover the transportation (walkway/trail) features. This project is included in the city's 2023 Capital Improvement Plan (CIP). As of May 5, 2023, design work has commenced, and the layout has been approved and expected to be completed August 30, 2023. Construction timeline is not available at this time. Project is on-schedule to be bid out in November 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents