Similar Projects
4Front Office And Industrial Area Expansion
Addition, Infrastructure - 310,000 SF
Conception
Oakdale, MN

Phase 3 Regional Drainage Improvements - SW-002 - City of Elmo
Infrastructure
Conception
$500,000 est. value
Lake Elmo, MN

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

2022 Bluff Toe Stabilization Project
Infrastructure
Bidding
$400,000 CJ est. value
Lake Saint Croix Beach, MN 55043

RFP Construction Manager - West Central Service Center
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Woodbury, MN 55125

Gordon Bailey ES Pavement Rehabilitation
Post-Bid
Woodbury, MN 55129

2021 Pavement Management
Infrastructure
Post-Bid
Grant, MN

Highway 36 and Manning Avenue Interchange
Results
MN

2021 Runway 14/32 Replacement Phase 3
Results
$4,468,970 est. value
Lake Elmo, MN 55042

Oakdale Business Park Development
New Construction, Infrastructure - 300,000 SF
Pending Verification
$65,000,000 CJ est. value
Oakdale, MN 55128

Oakdale Business Park Development
New Construction, Infrastructure - 300,000 SF
Pending Verification
$65,000,000 CJ est. value
Oakdale, MN 55128

Phase 2 Regional Drainage Improvements - SW-001 - City of Elmo
Alteration
Conception
$600,000 est. value
Lake Elmo, MN 55042

Lions Park Redevelopment - City of Hugo
New Construction, Infrastructure - 5,500 SF
Design
$1,000,000 CJ est. value
Hugo, MN 55038

West Freeway Drive
Infrastructure
Bidding
$800,000 CJ est. value
Columbus, MN 55025

Last Updated 09/08/2022 03:54 PM
Project Title

Lake Elmo Airport - 2022 Runway 14/32 Replacement-Phase 4

Physical Address View project details and contacts
City, State (County) Lake Elmo, MN 55042   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $4,018,458 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement removal, excavation and embankment, grading, geotextile fabric, granular borrow, P 208 aggregate base, P-401 bituminous pavement, culvert pipe installation, pavement markings, taxiway lighting, airfield signage, precision approach path indicator (PAPI) installation, runway end identifier lights (REIL) installation, and turf establishment. Please see Notice of Call for Bids for additional bidding information. For assistance and free membership registration, contact QuestCDN at 952.233.1632 or info@questcdn.com. A pre-bid conference will not be held for this project. This report concerns our recent subsurface exploration and geotechnical review for the proposed 30th Street North Pavement Rehabilitation project located east of Manning Avenue and just south of the Lake Elmo Airport. A geotechnical exploration program was performed to identify the subsurface conditions and aid in project design and construction. 1.1 Scope of Work We recently performed a geotechnical exploration program in accordance with our proposal dated July 3, 2019, and your subsequent authorization to proceed. The scope of our work for the referenced project was as follows: Arrange to have buried public utilities marked through the Gopher-State-One-Call system. Notify FAA and Mn/DOT Aeronautics to arrange for locating FAA buried utilities/cables at the airfield within the proposed drilling areas. Several utilities were located within or adjacent to the proposed drilling areas including sewer, water, communication, and electric lines servicing the airfield and associated hangars. Explore the subsurface conditions by performance of five (5) standard penetration test borings to unit depths of approximately six (6) feet within the existing 30th Street North pavement areas as shown on the attached sketch using a truck mounted drill rig. Visually classify the extracted soil samples. Selected samples were submitted to the laboratory for moisture content, mechanical analysis, Atterberg Limit, and organic content testing. The results of the laboratory tests are included on the boring logs and/or attached to this report. Prepare a geotechnical engineering report which includes the following information: Sketch showing the approximate boring locations. Logs of soil test borings showing the soil and groundwater data. Document the existing in-place pavement, aggregate base, and sub-base thicknesses, if encountered, at the boring locations. Written description of encountered soil and groundwater conditions.

Details

Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Airfield Signaling and Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents