Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

980 Crest Valley Drive Stormwater Improvement
Infrastructure
Bidding
Atlanta, GA 30327

Ashbury Park Drive CMP Replacement Project
Infrastructure
Bidding
Roswell, GA 30075

Creek Walk Connector Trail
New Construction
Post-Bid
GA 30324

Lower Dixie Lake Road Sidewalk Improvements
Infrastructure
Post-Bid
Union City, GA

GSU Stadium Road Development - Phase II
Results
Less than $487,385 est. value
Atlanta, GA 30312

Roswell Road Transit Access Project
Results
Sandy Springs, GA 30328

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Ashbury Park Drive 30 Inch Corrugated Metal Pipe Replacement
Infrastructure
Bidding
GA 30075

Sidewalk Repair and Replacement
Infrastructure
Post-Bid
Milton, GA

Hammond Park Erosion and Improvement Project
Results
Sandy Springs, GA 30328

Midblock Crossings
Alteration
Bidding
Alpharetta, GA 30009

Public Parking Lot and Sanitary Sewer Installation
Infrastructure
Post-Bid
Duluth, GA 30096

Roberts Drive Sidewalk Project
Results
Sandy Springs, GA 30328

Reported 03/09/2022 12:00 AM
Project Title

Asphalt Trail and Drainage Projects

Physical Address View project details and contacts
City, State (County) Milton, GA   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The general scope of work will consist of removing the deep ditch drop off at the entrance of Providence Plantation. This area will be leveled with suitable fill and by adding a precast GDOT 9031 S drop inlet onto the existing RCP under Providence Plantation Drive. The project also includes adding 24” RCP pipe and a safety end section along the ditch line, The contractor will place rip rap around the safety end section, place sod, and pinestraw over the disturbed area. VIRTUAL BID OPENING: MEETING LINK FOR 3/8/22 @ 2:30 PM Join Zoom Meeting https://us06web.zoom.us/j/81248597392 Meeting ID: 812 4859 7392 One tap mobile +19292056099,,81248597392# US (New York) 13017158592,,81248597392# US +(Washington DC)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents