Similar Projects
Last Updated | 06/20/2023 07:09 PM |
Project Title | North Main Water Use Efficiency & Reliability Project |
Physical Address | View project details and contacts |
City, State (County) | Greenville, CA 95947 (Plumas County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project consists of the installation of approximately 300 feet of 8-inch diameter C900 PVC pipe and 331 feet of 4-inch C900 PVC pipe for potable water along with valves and fittings as shown on the Contract Drawings. The Project also includes the installation of customer services and the installation of fire hydrants, ARV's and blow-offs. The Project also includes the demolition and abandonment of existing pipeline, customer services and hydrants as shown on the Contract Drawings. Hand delivered Bids will be received at which time Bids will be publicly opened and read. Each Bidder shall have a Class A General Engineering California Contractor's License. Owner anticipates that the Project's total bid price will be approximately $400,000. The Project has an expected duration of 90 days. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |