Project Title | Plumbing Work Associated with the Central Energy Plant High Temperature Hot Water System Replacement |
Physical Address | View project details and contacts |
City, State (County) | Riverhead, NY 11901 (Suffolk County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000330305 Plumbing Work Associated with the Central Energy Plant High Temperature Hot Water System Replacement Suffolk County Community College is accepting bids from qualified contractors to perform plumbing work associated with the replacement of the high temperature hot water boilers and connected piping and equipment as well as to replace cooling tower condenser water pumps on the Eastern Campus in Riverhead, NY, located at 121 Speonk-Riverhead Road, Riverhead, NY 11901. As part of the overall project to replace the high temperature hot water boilers and associated piping and equipment, and the cooling tower condenser water pumps, the College will be issuing three bid solicitations as follows: Job Location Eastern Campus 121 Speonk-Riverhead Rd Riverhead, New York United States 11901 Bid Intent Optional Bid Intent Deadline 10/16/2023 04:00 PM EDT Question Acceptance Deadline 10/04/2023 04:00 PM EDT Questions are submitted online No All technical questions must be submitted via email to Seema Menon at menons@sunysuffolk.edu |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |