Similar Projects
Wisconsin 175 Improvements - Wisconsin Department of Transportation
Infrastructure
Conception
$6,686,850 CJ est. value
Milwaukee, WI 53224

Redevelopment Opportunity - 1214 Milwaukee Avenue - City of South Milwaukee
New Construction, Infrastructure
Conception
$3,474,055 CJ est. value
South Milwaukee, WI 53172

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

South 13th Street Industrial Building
New Construction, Infrastructure - 191,406 SF
Design
$103,000,000 CJ est. value
Oak Creek, WI 53154

North Point Parking Lot Revetment
Infrastructure
Bidding
$1,326,060 CJ est. value
Milwaukee, WI 53202

North Point Parking Lot Revetment
Infrastructure
Bidding
$1,326,060 CJ est. value
Milwaukee, WI 53202

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

Fox Crossing Cold Spring Road Reconstruction
Infrastructure
Post-Bid
$470,000 CJ est. value
Greenfield, WI 53228

100 Lead Service Line Replacements
Infrastructure
Results
$2,000,000 est. value
Milwaukee, WI

Public Construction Phase 5 Site Utilities (Public and Private) at Westlawn Gardens Phase 2
Infrastructure
Results
$400,000 est. value
Milwaukee, WI

Eighteen87 On Water Mixed-Use Development
New Construction, Infrastructure - 107,000 SF
Construction
$21,000,000 CJ est. value
Milwaukee, WI 53202

Oakview Parkway Industrial Building
New Construction, Infrastructure - 130,710 SF
Construction
$90,000,000 CJ est. value
Oak Creek, WI 53154

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Multi-Family Oak Creek Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Oak Creek, WI 53154

Milwaukee Public Library Capitol Branch Redevelopment - City of Milwaukee
New Construction, Infrastructure
Conception
$4,500,000 CJ est. value
Milwaukee, WI 53216

Last Updated 01/04/2024 03:37 PM
Project Title

Elevated Water Storage Tank

Physical Address View project details and contacts
City, State (County) Franklin, WI 53132   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $6,833,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2023, this project has not yet been awarded. A timeline for award has not yet been established. As of December 12, 2023 , this project has not yet been awarded. The project is expected to be awarded on December 14, 2023. Site Directions: 8168-8118 WI-South 100th St., Franklin, WI 53132. The work, officially known as "Elevated Water Storage Tank", consists of the construction of a new 1-million-gallon Composite Elevated Storage Tank, water supply main, a new emergency power system and all associated appurtenances. WAGE RATES: Contractors are not required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts. OTHER PROVISIONS: The Contract letting shall be subject to the applicable provisions of the Wisconsin Statutes, Section 66.0901, 66.0903, 779.15. In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employees or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability, or national origin. This provision shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff and termination; rates of pay or other forms of compensation; selection for training, including apprenticeship. The Contractor further agrees to post in conspicuous places, available for employees and applicants for employment, notices setting forth the provisions of this non-discrimination clause. BID SECURITY: Bids shall be accompanied by a certified or bank check or a Bid Bond on the prescribed form payable to the Owner in an amount not less than 5% of the Total Base Bid as guarantee, that if the Bid is accepted, the Bidder will execute and file the Agreement, Performance and Payment Bonds, and Insurance Certifications, as required by the Contract Documents, within 15 days after the Notice of Award. BID REJECTION/ACCEPTANCE: The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of Owner. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 90 days after the scheduled opening of the Bids without the consent of the Owner. Project questions shall be submitted to Will Hein at wahein@ati-ae.com system prior to November 2, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents