Similar Projects
Cleaning of Boilers - Public Buildings
Alteration
Bidding
Danbury, CT 06810

Regan Boilers and Heating Pumps Replacement at Regan Elementary School
Alteration
Bidding
Waterbury, CT 06704

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Z--B 29 Boiler and Air Compressors Maintenance and Repair, Naval Submarine Base New London CT
Results
Groton, CT 06349

Replacement of 2 Boilers at John G. Prendergast School
Results
$200,000 to $300,000 est. value
Ansonia, CT 06401

Replacing the Hot Water Heater
Post-Bid
New London, CT 06320

Cafeteria Renovations Highland School (Replace Government Freezer)
Results
Cheshire, CT 06410

HVAC Systems and Domestic Hot Water Upgrades
Post-Bid
Newington, CT 06111

High Plains Community Center Boiler Replacement
Results
Less than $40,160 est. value
Orange, CT 06477

JFK School Water Heater Upgrade
Post-Bid
Bridgeport, CT

Fire Head Quarters (HQ) Boiler Replacement Design Services
Results
Cheshire, CT 06410

Boiler Maintenance Services at 50 Field Street
Post-Bid
Torrington, CT

Remove & Replace Existing Water Heater
Results
New London, CT 06320

Electric Water Heater Replacement at Arthur F. D`Amato Apartments (CT 5-9)
Post-Bid
New Britain, CT

Reported 06/04/2021 12:00 AM
Project Title

Killingworth Elementary School Boiler Piping Redesign

Physical Address View project details and contacts
City, State (County) Higganum, CT   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project demolition scope includes demolition of eight (8) hot water circulator pumps and their corresponding electrical circuits, and partial demolition of existing hot water supply and return piping, valves, and fittings. The project new work scope includes re-piping the hot water supply and return piping into a primary-secondary configuration, installation of two (2) new constant speed primary pumps at the two (2) boilers, installation of two (2) new base-mounted secondary pumps with variable speed drives, modification of the existing Alerton DDC system to control the new pumps, and insulation of all hot water supply and return piping in the boiler room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents