Similar Projects
Demolition and Abatement Services
Demolition, Alteration
Bidding
$310,000 est. value
Baton Rouge, LA

Demolition and Abatement Services
Demolition, Alteration
Bidding
$310,000 est. value
Baton Rouge, LA

Demoliton and Cleanup
Demolition
Post-Bid
Lafayette, LA 70501

Demolition at 212 Karen Drive
Demolition
Post-Bid
Lafayette, LA 70503

Labarre Elementary School Demolition
Infrastructure
Results
$300,000 est. value
New Roads, LA

Drainage Pump Station 13 Asbestos Abatement
Alteration
Results
New Orleans, LA 70131

Environmental Testing and Monitoring Services
Alteration
Bidding
Lake Charles, LA

Demolition of Louis DOC Bonin Generating Station Units 1,2 and 3 Cooling Towers
Demolition
Post-Bid
Lafayette, LA 70506

Columbia Building Demolition
Demolition
Results
Columbia, LA 71418

Demolition and Clean up of Asbestos Containing Structure and Materials
Demolition, Alteration
Post-Bid
Lafayette, LA 70503

Demolition of Dilapidated Structure at 2453 Trichel Street
Infrastructure
Results
Bossier City, LA 71112

Demolition Contractor Services
Infrastructure
Post-Bid
Alexandria, LA

Demolition of Dilapidated Structure at 404 North Circle
Infrastructure
Results
Bossier City, LA 71111

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Demolition at 325 Morse Street
Infrastructure
Results
Lafayette, LA 70501

Reported 05/27/2022 12:00 AM
Project Title

Asbestos Materials Abatement and Demolition - Old Jefferson Terrace Elementary School

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70809   (East Baton Rouge County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Environmental
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Environmental Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and asbestos abatement for an educational facility in Baton Rouge, Louisiana. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility. Bid Documents will be available electronically at a fee from a vendor designated by the Architect. The successful Bidder is allowed 60 calendar days to complete the Project from the commencement date stated in the Agreement or a Notice to Proceed. Liquidated damages will be assessed at $1,000.00 for each consecutive calendar day for which the work is not substantially complete and $1,000.00 for each consecutive calendar day beginning the 46th day after the date of Substantial Completion for which all of the work listed on the punch list is not complete. The East Baton Rouge Parish School Board has adopted a Fair Share Procurement Policy with a goal of at least twenty (20%) percent participation by MWBEs. The policy and goal apply to this project. Bid Documents may be reviewed at the office of Coey Malveaux, 4070 Tunica Street, Room #6, Baton Rouge, LA 70805, East Baton Rouge Parish School System Wilma C. Montgomery Center and Bid Express. Bids must be accompanied by a bid security equal to five percent (5%) of the base bid and include all additive alternates in the form of a certified check, cashiers check or bid bond. A bid bond shall be written by a company that complies with the provisions of La. R.S. 38:2218C. The successful bidder is required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract amount and a Payment Bond in an amount equal to one hundred percent (100%) of the contract amount written by a company that complies with the provisions of La. R.S. 38:2219 and on the East Baton Rouge School Boards Forms included in the Bidding Documents. The apparent low bidder must complete and deliver to Coey Malveaux at the address stated above within ten (10) calendar days after the date of the opening of the Bids- the sworn affidavit required to comply with La. R.S. 38:2212.10 regarding an employee status verification system, the signed no conviction affidavit required by La. R.S. 38:2227, the non-collusion affidavit required by La. R. S. 38:2224, and other required documents as specified in the Bidding Documents. No bid may be withdrawn for a period of 45 days after the date of the bid opening except as provided by law. Bidders must meet the requirements of the State of Louisiana Contractors Licensing Law, R.S. 37:2151 et seq. Note: Bids Shall Only Be Accepted From Contractors Who Are Licensed Under Louisiana Contractors Licensing Law for the Major Classification of Hazardous Materials and/or Sub-classification of Asbestos Removal, Abatement. East Baton Rouge Parish School Board reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities as allowed by law.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents