Similar Projects
Professional Operation of the Off-street Parking Facilities
Infrastructure
Bidding
$80,000 est. value
Hoboken, NJ

Parking Lot at the Old York School
Infrastructure
Bidding
$2,000,000 est. value
Somerville, NJ 08876

Stanhope Pedestrian Loop Phase 2
Post-Bid
Stanhope, NJ 07874

Bid #2 Parking Lot Repaving
Post-Bid
Westfield, NJ 07090

Repaving of Parking Lots at Various Sites
Results
Bayonne, NJ 07002

Drum Point/Emma Havens Young Elementary School Parking Lot Improvements - Phase II
Results
Brick, NJ 08723

Reconstruction and Resurfacing of Brookside Drive from NJ State Highway No. 37 East to Cedar Grove Road
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Toms River, NJ 08753

Recreation Trail/Sidewalk Connection Project
Post-Bid
Newark, Washington, NJ 07882

Road Program-Curbs,Sidewalks,ADA Ramps
Results
Piscataway, NJ 08854

Multi-Purpose Building (Hornet Road)
Renovation, Demolition, Infrastructure - 5,400 SF
Bidding
$400,000 est. value
Lower Township, NJ 08242

Anderson Avenue Streetscape Improvements - Phase 2
Infrastructure
Post-Bid
Fairview, NJ

2020 ADA Curb and Ramp Installation
Results
New Brunswick, NJ 08901

FY 2020 N.J.D.O.T. Municipal Aid Program, Downtown Streetscape Improvements Section 3
Infrastructure
Bidding
$630,000 est. value
Little Falls, NJ

Lot 7 Stairs Replacement
Alteration
Post-Bid
Little Falls, NJ

Reconstruction of Existing Brick Sidewalks / Laurel Street / Phase I
Results
Bridgeton, NJ 08302

Reported 06/17/2022 12:00 AM
Project Title

Sandyston Municipal Complex Bike and Walking Path

Physical Address View project details and contacts
City, State (County) Branchville, NJ 07826   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work to be constructed along with their approximate quantities are as follows: Excavation, Earth: 190 Cu. Yd., Hot Mix Asphalt 9.5M64, 2" Thick: 135 Tons, Dense Graded Aggregate Base Course, 4" Thick: 260 Tons ,Topsoiling 2" Thick, Seeding, Fertilizing & Mulching: 525 Square Yards, Other Items.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents