Similar Projects
PS/IS 288
Renovation
Conception
$2,400,000 est. value
Brooklyn, NY 11224

F-M High School Expansion
Addition
Conception
$52,000,000 est. value
Manlius, NY 13104

Salamanca CSD Improvements - Phase 3.3 and 3.4
Design
Salamanca, NY 14779

Castle Island Montessori School Relocation
Renovation - 6,400 SF
Design
Albany, NY 12207

Piseco Common SD - Window, Light Replacement and Walking Path
Alteration
Bidding
$185,000 est. value
Piseco, NY

Roof and Interior Plaster Repairs at Patricia A. Dichiaro School 8
Renovation
Bidding
Yonkers, NY 10708

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

2018 Capital Project-Phase II
Results
Less than $2,500,000 est. value
Trumansburg, NY 14886

2018 Capital Project-Phase II
Results
Less than $2,500,000 est. value
Trumansburg, NY 14886

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

German School Manhattan
Build-Out - 3,600 SF
Pending Verification
New York, NY 10007

Harvey School: Weil House & Barn Complex
New Construction, Demolition - 5,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Katonah, NY

New District 31 Elementary School
New Construction
Design
Staten Island, NY 10314

Last Updated 02/03/2022 04:45 PM
Project Title

Carmel CSD - George Fischer Library Improvements and District Wide ADA Compliance

Physical Address View project details and contacts
City, State (County) Carmel, Patterson, NY 10512   (Putnam County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1: General Construction Contract No. 2: Plumbing Construction Contract No. 3: HVAC Construction Contract No. 4: Electrical Construction General Construction: 1. Remove existing wall partitions and wall components as indicated. 2. Remove existing floor, wall and ceiling finishes and gird as indicated. 3. Remove existing toilet partitions, partition doors, partition mounting accessories and toilet room accessories (recessed and/or wall mounted) as indicated. 4. Remove existing toilet room doors, frames and door hardware. Surrender door hardware to Owner. 5. Remove existing ceilings as inidcated. 6. Remove existing concrete entry platform as indicated. 7. Demolition of existing Gerorge Fisher Library as indicated. 8. Provide and install new walls and/or infill openings as inidcated. 9. Provide and install new floor, wall and ceiling finishes and grid as inidcated. 10. Provide and install new toilet partitions and toilet room accessories as indicated. 11. Provide and install new doors, frames and door hardware. 12. Provide and install new concrete pad, ramp and sidewalk as indicated. 13. Provide and install new George Fischer Library as indicated. 14. Provide firestopping for penetrations through rated assemblies. 15. Provide cutting and patching as specified. HVAC: 1. All work related to interior alterations as noted in the contract documents including removal and new HVAC configuration. 2. Provide firestopping for penetrations through rated assemblies. Plumbing: 1. Disconnect and remove existing plumbing fixtures as indicated. 2. Disconnect and remove associated domestice water, sanitary and vent piping back to assocaited main line and cap. 3. Disconnect and remove existing water piping servng water closet to be demolished as indicated. 4. Disconnect and remove existing waste and vent piping serving the water closets to be demolished. 5. Provide and install new water closets, flush valves, supports and required piping as indicated. 6. Provide and install urinal, flush valve, supports and required piping as indicated. 7. Provide and install lavatory, faucet, accessories and required piping as indicated. 8. Extend and connect to existing waster and vent piping as indicated. 9. Extend and connect cold and hot water piping as indicated. 10. Provide firestopping for penetrations through rated assemblies. 11. Provide cutting and patching as specified. Electrical: 1. All work related to interior alterations as noted in the contract documents including removal and new lighting. 2. Removal of existing and installation of new lighting in existing bathrooms and George Fischer Library. 3. Disconnects and reconnections required fro new HVAC equipment. 4. Provide firestopping for penetrations through rated assemblies. 5. Provide cutting and patching as specified.

Details

Middle/Senior High School, Renovation, Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents