Similar Projects
West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Cameron Creole Maintenance Project
Term Contract
Bidding
$91,000 est. value
Baton Rouge, LA

Maintenance of Drainage Systems
Alteration
Bidding
Lafayette, LA

Luling Pe Office Flood Damage Repairs
Infrastructure
Post-Bid
$50,000 to $100,000 est. value
Luling, LA 70070

Cypress Island/Joe Daigre Drainage System Maintenance Project - Phase I
Infrastructure
Post-Bid
Saint Martinville, LA

LA 1 - Port Allen Canal Br Repl (PH1)(HBi)
Infrastructure
Results
$50,000,000 to $70,000,000 est. value
Shreveport, LA 71115

SB 1811 Farr Park Equestrian Center Phase 1 Arena
New Construction
Results
$740,000 to $800,000 est. value
Baton Rouge, LA 70820

Galvanized Metal Culverts
Term Contract
Bidding
LA

Culverts and Pipes
Infrastructure
Post-Bid
Saint Martinville, LA

District 04 Flashing Yellow Arrow Part 1
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
LA

Used Steel Pipe with Various Diameter and Length
Term Contract
Bidding
LA

Bayou Teche Flood Control Structure Phase 2
Infrastructure
Post-Bid
$90,400 est. value
Morgan City, LA

LA 3287: LA 700 - LA 343
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Various Materials 2022 - Culverts
Term Contract
Bidding
LA

Last Updated 11/16/2021 04:32 PM
Project Title

Tuscany Estates Drainage

Physical Address View project details and contacts
City, State (County) LA   (Saint Tammany County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $83,413
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all adequate and competent labor, equipment, tools, testing, and materials necessary to install driveway culverts, cross culverts, and ditches on Napa Valley Way and Naples Court, north of Brownswitch Road and west of Interstate 59 in Slidell.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents