Similar Projects
Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Lowell - Hartford Const / PVRPLA
Infrastructure
Bidding
$12,000,000 CJ est. value
Clyman, WI 53039

Lowell - Hartford Const / PVRPLA
Infrastructure
Bidding
$12,000,000 CJ est. value
Clyman, WI 53039

2021 Road Seal Coating and Crack Filling
Infrastructure
Post-Bid
Beaver Dam, WI

Bobolink Road
Infrastructure
Post-Bid
Lowell, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Dodge County Justice Building Parking Lot Paving
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

RFP D/B - Design and Install Electrical Service and Pedestals at Derge Park Campground, Beaver Dam
Infrastructure
Bidding
$100,000 CJ est. value
Beaver Dam, WI 53916

Snow Plowing/Winter Maintenance
Term Contract
Post-Bid
Kekoskee, WI

Road Project
Results
Mayville, WI

Juneau Wastewater Treatment Facility Upgrade
New Construction, Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Juneau, WI 53039

2022 Bridge Street Reconstruction
Infrastructure
Post-Bid
Mayville, WI

Roadwork
Results
Lebanon, WI

Last Updated 01/11/2023 02:05 AM
Project Title

Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface

Physical Address View project details and contacts
City, State (County) Iron Ridge, WI 53035   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Oconomowoc - Mayville Wsor Rr Xing 387041a Rr Ops / Crossing Repair / Resurface State 3r Estimate Anticipated Funding $100,000-$249,999 As of January 11, 2023, the project is in Final Planning status. Anticipated letting date is April 25, 2023. WisDOT - Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents