Similar Projects
The Hole In The Wall Gang Camp
New Construction
Conception
$2,800,000 est. value
Ashford, CT 06278

New Ice Rink
New Construction
Conception
$17,000,000 est. value
Greenwich, CT

Tyde at Walnut Beach
New Construction - 12,203 SF
Construction
$1,600,000 est. value
Milford, CT

Design Build Services for Ice Rink
New Construction
Post-Bid
East Haven, CT 06512

Design-Build Services for a Pre-Engineered Metal Pavilion at Mixville Park
New Construction
Bidding
Cheshire, CT 06410

Art Studio
Renovation - 1,800 SF
Pending Verification
Bristol, CT 06010

Installation Of An Outdoor Basketball Court
New Construction
Post-Bid
Waterbury, CT 06702

Wood Avenue Pavilion Repair
Results
Bridgeport, CT

YMCA Renovation
Renovation, Addition - 25,000 SF
Construction
$8,000,000 est. value
Middletown, CT 06457

Outdoor Classroom Pavilions
New Construction
Results
Meriden, CT 06450

Willow Brook Park Shelter
Results
New Britain, CT 06051

Matthews Park
Renovation
Conception
$505,000 est. value
Norwalk, CT 06850

Last Updated 02/01/2022 01:05 PM
Project Title

Camp Cochipianee Pavilion Kit

Physical Address View project details and contacts
City, State (County) Goshen, CT 06756   (Litchfield County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design, construction and erection: 1.20 ft x 30 ft open air timber Post and Beam structure. 2.9 ft in height to the eave 3.8x8" perimeter posts (alternate sizes will be considered) 4.24" gable and eave overhangs 5.Electrical and lighting will be provided by others, but structure shall include mortises for two electrical outlets in the posts and 1" conduit in a column to accommodate lighting in the ceiling. 6.The site work including the concrete slab will be completed by others, but the structure building contractor shall coordinate with the Public Works Supervisor on the design of the foundation and concrete slab.

Details

Misc. Recreational, New Construction.
Division 13 - Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents