Similar Projects
Daytona Campus - Parking Lots A, B and C
Post-Bid
Daytona Beach, FL 32114

Brewster Park - Parking and Overlook Improvements
Results
Less than $101,300 est. value
Deltona, FL 32738

Fort Smith/Beechdale/Blue Heron Park - Parking Improvements
Results
Less than $52,340 est. value
Deltona, FL 32725

WRF Sludge Trailer Storage Lot
Results
Less than $255,000 est. value
Port Orange, FL 32127

Deltona Lakes and Spirit Elementary Sidewalk Project
Results
Less than $711,587 est. value
Deltona, FL 32725

CDBG Riviera Park Parking Improvements
Results
Ormond Beach, FL 32173

Concrete Work
Results
Daytona Beach, FL 32117

Ponce Deleon Boulevard Multi-Use Path
Results
Less than $370,000 est. value
De Leon Springs, FL

Marine Science Center ADA Enhancements
Results
Less than $65,000 est. value
Ponce Inlet, FL 32127

New Hampshire Avenue ADA Sidewalk
Results
Less than $127,000 est. value
De Land, FL 32720

Sidewalk Repair & Reconstruction Project
Term Contract
Results
Less than $19,734 est. value
DeBary, FL 32713

Fleming Avenue ADA Sidewalk
Results
Less than $70,500 est. value
De Land, FL 32720

Orange City Votran Parking Lot
Results
Less than $715,000 est. value
Orange City, FL 32763

Spring to Spring Trail, 3B, Rob Sullivan Park to Dirksen
Results
Less than $2,575,000 est. value
DeBary, FL 32713

Lime Tree Drive ADA Sidewalk Project
Results
Less than $155,000 est. value
Edgewater, FL 32132

Last Updated 11/25/2019 11:08 AM
Project Title

ADA Sidewalk Extension from Mill Lake Park to Oak Avenue

Physical Address View project details and contacts
City, State (County) Orange City, FL 32725   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $64,070
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, material, equipment, supervision and incidentals necessary to furnish and construct an ADA sidewalk extension from Mill Lake Park to Oak Avenue in Orange City in accordance with the terms and conditions of the bid documents and specifications. The project shall include, but is not limited to the construction of approximately 750 square yards (SY) of 4” thick sidewalk and 50 SY of 6” thick sidewalk (over driveways). The project will also include the removal and disposal of approximately 400 LF of chain link/barbwire fencing, construction of ADA ramps, drainage swales along Cherokee Avenue in the South right of way (ROW), and sidewalk and ramp grading throughout the project. The sidewalk will be 8’ wide except for the section being constructed along Cherokee Avenue, which will be reduced to 6’ wide.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents