Similar Projects
Replacement Of Two 1.5 Ton Heat Pumps Systems
Bidding
Cape Elizabeth, ME

Design - Build Noise Controls for a Trane Screw Chiller
Post-Bid
South Portland, ME

Replacement of 154 Existing PTAC Units
Post-Bid
Brunswick, ME 04011

Construction of Cape Elizabeth and East End WWTF HVAC Upgrades
Results
Portland, ME 04104

HVAC Maintenance NWS Gray, ME
Results
Gray, ME 04039

Boys and Girls Club of Southern Maine
Construction
Portland, ME

HVAC Service
Term Contract
Post-Bid
Brunswick, ME 04011

On Call Air Compressors-Equipment Rental Without an Operator
Results

Edward T. Gignoux Federal Courthouse HVAC and Fire Alarm Upgrade
Post-Bid
$15,000,000 to $20,000,000 est. value
Portland, ME 04101

Design/Build HVAC System at Planning and Development
Results
South Portland, ME

Heat Pump Installation
Post-Bid
South Portland, ME

Annual Air Compressor Maintenance for Air National Guard Facilities
Results
Bangor, South Portland, ME

HVAC Construction
Post-Bid
Portland, ME

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

HVAC Upgrade at Western Avenue Fire Station
Results
South Portland, ME

Last Updated 03/03/2021 09:24 AM
Project Title

Deering High School Gym and Locker Rooms HVAC Renovation

Physical Address View project details and contacts
City, State (County) Portland, ME 04103   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $528,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing gymnasium and locker room HVAC systems are no longer functional and require replacement and upgrades. The project will correct issues with snow entrainment, improve energy controls, improve indoor air conditions and thermal comfort. Provide complete equipment, materials, labor, installation and startup for HVAC renovations shown on drawings and in specifications. Demo existing gymnasium rooftop HVAC equipment, air handlers within the gymnasium, locker rooms and wrestling room. Provide new equipment including energy recovery ventilators, hoods, air handlers, duct coils and controls. Provide curb adapters to transition rooftop equipment to existing curbs. Minor modifications to the ducting system is required. Addition of a heat pump system for the main office.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents