Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

Jones Boulevard Improvements
Infrastructure
Bidding
North Liberty, IA 52317

Hawkeye Wildlife Unit North Road and Babcock Access Road Maintenance
Infrastructure
Bidding
$190,000 est. value
Oxford, IA

2022 Bituminous Resurfacing
Infrastructure
Post-Bid
IA

3rd Street Reconstruction
Infrastructure
Post-Bid
Hills, IA 52235

Melrose Avenue / IWV Road - Highway 218 to Hebl Avenue Improvement
Infrastructure
Results
$5,100,000 est. value
Iowa City, IA 52240

2021 Water Pavement Patching
Infrastructure
Results
$132,000 est. value
Iowa City, IA

Muddy Creek Lane Patching and Subdrain
Infrastructure
Results
$143,810 est. value
Coralville, IA

Glendale Park Improvements
New Construction, Infrastructure
Results
$275,000 est. value
Iowa City, IA

Orchard Street Reconstruction
Infrastructure
Results
$1,220,000 est. value
Iowa City, IA

180th Street NE Single Coat Otta Seal
Infrastructure
Results
Solon, IA 52333

Heartland Drive Pavement Repair 2021
Infrastructure
Results
$125,120 est. value
Coralville, IA 52241

Johnson Co Lake MacBride PCC Road Reconstruction
Infrastructure
Results
$650,000 est. value
IA

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Benton Street Rehabilitation
Infrastructure
Results
$3,200,000 est. value
Iowa City, IA 52240

Last Updated 04/07/2022 01:58 PM
Project Title

East 5th Street Reconstruction

Physical Address View project details and contacts
City, State (County) Solon, IA   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct East 5th Street Reconstruction project including the full reconstruction of approximately 2,500 feet of an existing rural section HMA overlay street to a 31 feet wide 8" PCC street with curb and gutter and storm sewer. Improvements include all labor, materials, and equipment necessary to construct 8" PCC pavement (9,384 SY) on a 6" modified subbase (2,183 CY); subdrain (2,625 LF); intakes (24 Ea.); 12" – 42" storm sewer (2,847 LF); PCC driveways (830 SY); 6" PCC trail and sidewalk (1,951 SY); 8" water main (747 LF); traffic control; earthwork, excavation, backfill, sitework; erosion control, seeding and miscellaneous associated work including cleanup. The street will need to be constructed in three phases to maintain two-way vehicle traffic and access at all times.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents