Similar Projects
Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

Remodel of an Existing Building
Renovation - 12,500 SF
Bidding
$1,500,000 est. value
Henderson, TX 75652

New Bulverde Police Head Quarters
New Construction - 13,578 SF
Bidding
Bulverde, TX 78163

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

Fire Station No. 5
Post-Bid
TX

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Police Headquarters and Fire Station #2 and Administration Buildings
New Construction - 73,273 SF
Construction
Less than $19,700,000 est. value
Huntsville, TX 77340

Emergency Operations Center
Renovation
Pending Verification
Killeen, TX 76541

Station 5 Bay Remodel
Renovation
Pending Verification
Killeen, TX 76542

Fire Station 1 Remodel
Renovation
Conception
$2,000,000 est. value
San Marcos, TX 78666

Last Updated 03/17/2022 08:49 AM
Project Title

Park Police Headquarters

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78283   (Bexar County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this Project entails the remodel of the existing facility. The entry lobby remodel includes security and service agents station, as well as elevator and lobby stair updates. The first-floor remodel includes reconfiguration of former assembly areas to men’s and women’s locker rooms, police roll call, body camera docking area, report writing room, fitness, and training spaces. The second floor consists of minor reconfiguration and re-finish of existing office space to accommodate police offices, HR, and conference/breakroom functions. Building systems remodel include upgrade of the existing HVAC system, plumbing, electrical/lighting, and new emergency generator. Remodel to the building envelope is limited to replacement of the first-floor windows with ballistic glass and replacement of the existing roofing system. Site work is minimal and consists of 4 new parking spaces and minor landscaping required to meet tree preservation and Landscaping Ordinances.

Details

Fire/Police Station, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents