Similar Projects
Langlinais Road Expansion - City of Youngsville
Infrastructure
Conception
$21,800,000 est. value
Youngsville, LA

Louisiana 89 Widening
Infrastructure
Conception
$5,000,000 est. value
Broussard, LA 70518

US 90: Alex St - US 90 Bus
Infrastructure
Design
$2,500,000 CJ est. value
Lafayette, LA 70508

US 90: Alex St - US 90 Bus
Infrastructure
Design
$2,500,000 CJ est. value
Lafayette, LA 70508

Murphy Oil #6592/7872 / Lafayette
Demolition, New Construction, Infrastructure - 1,400 SF
Bidding
$1,500,000 CJ est. value
Lafayette, LA 70501

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

2021 LCG As-Needed Excavation and Disposal
Term Contract
Post-Bid
$600,000 est. value
Lafayette, LA

2015 Force Main and Sewer Infrastructure Upgrades Phase II
Infrastructure
Results
$4,300,000 to $4,800,000 est. value
Carencro, LA

La 98: Roundabout at Mills Street
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

US 90/Amb Caffery Interchange
Infrastructure
Construction
$136,521,560 CJ est. value
Lafayette, LA 70501

US 90/Amb Caffery Interchange
Infrastructure
Construction
$136,521,560 CJ est. value
Lafayette, LA 70501

Vermillion River Dredging, Drainage - City of Lafayette
Infrastructure
Pending Verification
$20,050,000 CJ est. value
Lafayette, LA 70501

Vermillion River Dredging, Drainage - City of Lafayette
Infrastructure
Pending Verification
$20,050,000 CJ est. value
Lafayette, LA 70501

Verot School Road Extension - City of Youngsville
Infrastructure
Conception
$22,100,000 est. value
Youngsville, LA 70592

Seven16 Lafayette Tower
New Construction, Infrastructure
Design
$140,000,000 CJ est. value
Lafayette, LA 70501

Last Updated 05/03/2023 11:31 AM
Project Title

Citywide Drainage Timberwood Subdivision, Kings Road Dorian Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Lafayette, LA 70501   (Lafayette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $865,725 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services Contractor will provide all material, labor and superintendent to install drainage on Kings Road and Dorian Drive, remove and replace drainage and associated structures within the Timberwood Subdivision described in the plan sheets. Questions relative to the bidding documents shall be addressed to (Jessica Cornay at 337-291-8553)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents