Similar Projects
Replacement of Bridge No. Nb-363 At Milepost A-59.20 in Lehigh County
New Construction, Infrastructure
Bidding
PA

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Bridge Repairs
Results

Major Bridge P3
New Construction
Post-Bid

Repair and Maintenance of 3 Cedar Creek Parkway Bridges
Results
Allentown, PA 18101

Bridge Replacement
New Construction, Infrastructure
Post-Bid
PA

Cotton Street Bridge
Results
Macungie, PA 18062

Bridge Replacement
New Construction, Infrastructure
Post-Bid
PA

Manassas Guth Covered Bridge Rehabilitation Project
Results
Allentown, PA

Mosserville Bridge Rehabilitation Project
Results
New Tripoli, PA 18066

Bear Road Bridge Replacement Project
Infrastructure
Results
New Tripoli, PA

Bridge Repairs
Renovation
Results

Geiger`S Covered Bridge Rehabilitation
New Construction, Infrastructure
Results
$500,000 to $999,999 est. value
PA

Last Updated 11/22/2021 12:12 PM
Project Title

Gehman Road Bridge Replacement

Physical Address View project details and contacts
City, State (County) Macungie, PA 18062   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the removal of an existing single span steel beam open grate bridge including abutments, wingwalls and footers; and replacement with a single span reinforced concrete plank bridge including footers, abutments, bridge deck with concrete overlay, approach slabs, wingwalls and footers. The existing bridge has an overall span of 16’-6”, the existing bridge roadway has a curb to curb width (between railings) of 23 feet. The proposed bridge has an overall span of 18 feet, the proposed bridge roadway has a curb to curb width (between railings) of 26’-6”. Construction will occur in a Township right-of-way and will include all required demolition, grading, restoration work, installation of bituminous concrete pavement, lawn area restoration, along with provisions for all necessary erosion and sedimentation controls.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents