Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Clearing and Grubbing Future School Site
Results
AL

Construction of Raw Water Main for Diamante Well
Infrastructure
Results
$277,790 est. value
Daphne, AL

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Live Oak Estates
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Fairhope, AL 36532

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Connector Road (Grading, Drainage, Pavement, Bridge, Fence Installation, Traffic Lighting, and Traffic Stripe) on SR-161
Infrastructure
Bidding
$60,040,075 CJ est. value
Orange Beach, AL 36561

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Post-Bid
Orange Beach, AL 36561

On Call Contractor Services for Water and Sewer
Infrastructure
Results
$30,000 est. value
Fairhope, AL

Last Updated 09/12/2022 09:20 AM
Project Title

USDA Water System Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time. Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. The Project includes the following Work: Installation of approximately 10,600 linear feet of 12-inch water main, 80 linear feet of 24-inch HDPE encasement (directional bore installation), 1240 linear feet of 14 HDPE water main (directional bore installation), and related appurtenances. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. - 5:00 p.m. and may obtain copies of the Bidding Documents from the Issuing Office as described. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest responsible and responsive bidder unless the Awarding Authority finds that all bids are unreasonable or that it is not in the best interest of the Awarding Authority to accept any of the bids. A responsible bidder is one who, among other qualities determined necessary for performance, is competent, experienced, and financially able to perform the contract. A responsive bidder is one who submits a bid that complies with the terms and conditions of the Advertisement for Bids and the Bid Documents. Minor irregularities in the bid shall not defeat responsiveness. All bidders must comply with the Presidents Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act and the Contract Workhours Act. All non-resident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractors License, evidence of proper registration with the Alabama Secretary of State (with original seal of the State of Alabama), as a foreign corporation and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a non-resident without these documents included will be rejected Guarantee will be required with each bid for at least 5% of the amount of the bid filed in the form of a certified check, Bid Bond, or irrevocable Letter of Credit acceptable to the Owner payable to Belforest Water System. Bid Bonds shall include certification that the bonding company is listed in Circular 570 of the U.S. Treasury Department. The name, address, telephone number, and contact person for the bonding company shall also be included. The successful bidder will be required to submit 100% performance and payment bonds or an irrevocable Letter of Credit which is acceptable to the Owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of Bidders is called to the license required by Title 34, Chapter 8, of the code of Alabama, 1975, and amendments thereto, relating to the licensing of General Contractors. No bid will be accepted from anyone, except a qualified Contractor, licensed by the State Licensing Board for General Contractors, unless otherwise required by the State Licensing Board. All bids shall be submitted in a sealed envelope bearing on the outside the name of the Bidder, Bidders License Number, Category, and License Expiration Date, address and name of the project. Envelopes containing bids must be addressed as follows, and delivered to Mr. Charles Dube, Board President, Belforest Water System, 9080 County Road 64, Daphne, AL 36526 bid for Usda Water System Improvements Phase 2. The Project has an expected duration of 90 days. The Work will be substantially complete within 90 days after the date when the Contract Times commence to run

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents